Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes the following Work: Replacement of a stormwater catch basin structure identified as CB BV169. The existing structure has an outlet pipe approx. 4-ft below pavement grade. The Contractor shall be responsible for verifying existing pipe inverts; removal and disposal of the existing structure and impacted hardscape materials; field verification and protection of existing utilities within the work area; procurement and installation of all materials required for the Work in conformance with the contract; erosion protection and sediment control; maintenance of stormwater drainage during construction; and traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Catch basin cleaning work.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Catch basin cleaning work.
AvailableWork includes 2,600 EA of Catch Basin - Clamshell Cleaning; 180 EA of Catch Basin - Vacuum/jet Cleaning and 500 Ton of Disposal of Catch Basin Cleanings.
Posted Date
Jan 7, 2026
Due Date
Jan 22, 2026
Release: Jan 7, 2026
Close: Jan 22, 2026
Work includes 2,600 EA of Catch Basin - Clamshell Cleaning; 180 EA of Catch Basin - Vacuum/jet Cleaning and 500 Ton of Disposal of Catch Basin Cleanings.
AvailableCatch basin cleanings and inspections.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Catch basin cleanings and inspections.
AvailableWork include removal of catch basin grates; visual inspection of subsurface drainage structures and drainpipes; working in parking lots, driveways, roadways, and off-pavement areas; accessing a potable water source; vacuuming of grit and debris from catch basins; and all other related necessary activities.
Posted Date
Dec 22, 2025
Due Date
Jan 21, 2026
Release: Dec 22, 2025
Close: Jan 21, 2026
Work include removal of catch basin grates; visual inspection of subsurface drainage structures and drainpipes; working in parking lots, driveways, roadways, and off-pavement areas; accessing a potable water source; vacuuming of grit and debris from catch basins; and all other related necessary activities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis