Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of 1,950 LF of 10" PVC sanitary sewer and 231 LF of 8" PVC sanitary sewer.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
work includes approx 1,897 LF of gravity sanitary sewer line; 2,072 LF of 2" force main, lift station, and road bores.
Posted Date
Jan 20, 2026
Due Date
Feb 5, 2026
Release: Jan 20, 2026
Close: Feb 5, 2026
work includes approx 1,897 LF of gravity sanitary sewer line; 2,072 LF of 2" force main, lift station, and road bores.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of mobilization; 1,002 LF of plug and abandon existing 7" dia hdpe; 105 LF of emovre existing 7" dia hdpe; 1 EA of abandon existing sanitary sewer manhole; 2 EA of remove existing standard sanitary sewer manhole; 1 LS of landscape clearing; 622 LF of install new 8" dia hdpe, solid wall pipe, sdr 9.0, above ground, including ac dike; 452 LF of install new 8" dia hdpe, solid wall pipe, sdr 9.0, underground; 2 EA of construct new standard sanitary sewer manhole; 3 EA of install new drop connection in existing sanitary sewer manhole to remain; etc, see outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Work includes 1 LS of mobilization; 1,002 LF of plug and abandon existing 7" dia hdpe; 105 LF of emovre existing 7" dia hdpe; 1 EA of abandon existing sanitary sewer manhole; 2 EA of remove existing standard sanitary sewer manhole; 1 LS of landscape clearing; 622 LF of install new 8" dia hdpe, solid wall pipe, sdr 9.0, above ground, including ac dike; 452 LF of install new 8" dia hdpe, solid wall pipe, sdr 9.0, underground; 2 EA of construct new standard sanitary sewer manhole; 3 EA of install new drop connection in existing sanitary sewer manhole to remain; etc, see outside link.
AvailableWork includes 5 EA ss-01 mh, 2 EA ss-02 mh, 610 LF 8" pvc sdr 26 sewer pipe, 390 LF 8" pvc c-900 sewer pipe, 370 LF 4" ductile iron sewer force main, 21 EA sanitary sewer cleanout, 270 LF 4" sdr 26 sewer lateral pipe, 70 LF 4" pvc c-900 sewer lateral pipe, 270 LF 4" ductile iron sewer lateral pipe, 4 EA pressure-type sanitary sewer cleanout, 5 EA 4" sanitary sewer gate valve. See outside link.
Posted Date
Jan 13, 2026
Due Date
Feb 20, 2026
Release: Jan 13, 2026
Close: Feb 20, 2026
Work includes 5 EA ss-01 mh, 2 EA ss-02 mh, 610 LF 8" pvc sdr 26 sewer pipe, 390 LF 8" pvc c-900 sewer pipe, 370 LF 4" ductile iron sewer force main, 21 EA sanitary sewer cleanout, 270 LF 4" sdr 26 sewer lateral pipe, 70 LF 4" pvc c-900 sewer lateral pipe, 270 LF 4" ductile iron sewer lateral pipe, 4 EA pressure-type sanitary sewer cleanout, 5 EA 4" sanitary sewer gate valve. See outside link.
AvailableThe project includes the following work: extend 12" sanitary sewer main south from the city's existing 24" sewer main, continuing with a bore under highway for a total of about 1,600 LF of 12" sanitary sewer main.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
The project includes the following work: extend 12" sanitary sewer main south from the city's existing 24" sewer main, continuing with a bore under highway for a total of about 1,600 LF of 12" sanitary sewer main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →