Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Avoid; pivot to coops/resellers for fastest, lowest-friction path.
Coops: Lead with Sourcewell and place the order through an authorized reseller.
Village of Hobart, WI: No evidence of sole-source awards in public records (2019–2025). Treat this path as high friction with likely heavy justification and approvals.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Village of Hobart's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Village Treasurer
Director of Planning and Code Compliance
Village President
Village Administrator
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Village of Hobart
Installation of 1,950 LF of 10" PVC sanitary sewer and 231 LF of 8" PVC sanitary sewer.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
Village of Hobart
Close: Feb 10, 2026
Installation of 1,950 LF of 10" PVC sanitary sewer and 231 LF of 8" PVC sanitary sewer.
AvailableVillage of Hobart
Work includes inlet protection, complete 6 EA; silt fence, complete 650 LF; tracking pad, complete 1 EA; concrete pavement, 8" complete 1,150 SY; concrete curb & gutter, 30", complete 550 LF; geogrid reinforcement, type I, complete 150 SY; non-woven geotextile, type SAS, complete 150 SY; earthwork, strip, salvage and stockpile existing topsoil, complete 1 LS; earthwork, unclassified excavation, complete 1 LS; earthwork, excavation below subgrade, complete 50 CY; crushed aggregate base course, gradation no. 4, 8" thick, complete 1,375 SY; landscaping topsoil, fertilize, seed, and temporary erosion control blanket, complete 3,500 SY; water main pipe, PVC C-900, 12" complete 225 LF. See attached file.
Posted Date
Jul 25, 2025
Due Date
Aug 13, 2025
Release: Jul 25, 2025
Village of Hobart
Close: Aug 13, 2025
Work includes inlet protection, complete 6 EA; silt fence, complete 650 LF; tracking pad, complete 1 EA; concrete pavement, 8" complete 1,150 SY; concrete curb & gutter, 30", complete 550 LF; geogrid reinforcement, type I, complete 150 SY; non-woven geotextile, type SAS, complete 150 SY; earthwork, strip, salvage and stockpile existing topsoil, complete 1 LS; earthwork, unclassified excavation, complete 1 LS; earthwork, excavation below subgrade, complete 50 CY; crushed aggregate base course, gradation no. 4, 8" thick, complete 1,375 SY; landscaping topsoil, fertilize, seed, and temporary erosion control blanket, complete 3,500 SY; water main pipe, PVC C-900, 12" complete 225 LF. See attached file.
Village of Hobart
This project includes pulverizing and paving of various roadways (Butternut Lane, Inverary Court, Haven Place, Belmar Road, and Plane Park Drive), reconstruction of Bay Ridge with concrete pavement and culvert replacements, S Overland culvert replacement, curb and gutter patching, asphalt patching, sidewalk patching, and landscaping in accordance with the plans and specifications.
Posted Date
Jun 13, 2025
Due Date
Jun 27, 2025
Release: Jun 13, 2025
Village of Hobart
Close: Jun 27, 2025
This project includes pulverizing and paving of various roadways (Butternut Lane, Inverary Court, Haven Place, Belmar Road, and Plane Park Drive), reconstruction of Bay Ridge with concrete pavement and culvert replacements, S Overland culvert replacement, curb and gutter patching, asphalt patching, sidewalk patching, and landscaping in accordance with the plans and specifications.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.