CityNJ
Posted
Aug 27, 2026
Sep 29, 2026
2025 NJDOT Safe Streets To Transit
Base Bid will consist of milling, resurfacing, ADA ramp construction and associated sidewalk transitions to ADA Ramps and curb, select sidewalk reconstruction, select full-depth roadway repair, installation of pavement striping, resetting of all sanitary structures and storm drainage structures, installation of a new traffic signal, at the intersection. The scope of work within the Alternate Bid 1 will consist of roadway restriping, and installation of regulatory warning signs, polymer cement bus-stop surfacing, and installation of rectangular rapid flashing beacon signs on the intersection of Street and within the City. Alternate Bid 2 will consist of milling, resurfacing, ADA ramp construction and associated sidewalk transitions to ADA Ramps and curb, installation of pavement striping, resetting of all sanitary structures and storm drainage structures, and installation of rectangular rapid flashing beacon signs on the intersection.