Retrieving RFP details
Release
Close
City of Aurora
Works include approx. 208 VF 4' High Priority - Full Structural Lining (Type A); 344 VF of 4' High Priority - Semi Structural Lining (Type B); 163 VF of Low Priority - Semi Structural Lining (Type B). See outside link.
City of Siloam Springs
Rehabilitation of existing manholes within the city's sewer collection system.
St. Johns County
Work includes install cured-in-place pipe lining and pipe slip lining for storm drain pipe of various shapes and sizes and sanitary wastewater infrastructure assets of various shapes and sizes on an as-needed basis through issuance of task orders for each project. The scope includes providing pre- and post-inspection reports, bypass pumping and performing other miscellaneous repairs.
City of Buffalo
Work includes approx 140 LF of 6" CIPP sanitary sewer lining; 7,445 LF of 8" CIPP sanitary sewer lining; 100 EA reinstate sanitary sewer service; 1,485 LF 10" CIPP sanitary sewer lining; 20 EA CIPP lateral connection liner; See outside link.
Release
Oct 03, 2025
Close
Nov 12, 2025