Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
AvailableCity of Hobbs (NM) solicits sealed bids to furnish and install Trunk Line F sanitary sewer replacement (Phase 9) in Hobbs, NM. Procurement is for construction/installation of a sanitary sewer trunk line; bids are to be submitted to the City Finance Director and will be publicly opened at City Hall. A pre-bid conference will be held (attendance optional). Contract documents are available free from the City Engineering Department (Tel: 575-397-9232).
Posted Date
Dec 7, 2025
Due Date
Jan 8, 2026
Release: Dec 7, 2025
Close: Jan 8, 2026
City of Hobbs (NM) solicits sealed bids to furnish and install Trunk Line F sanitary sewer replacement (Phase 9) in Hobbs, NM. Procurement is for construction/installation of a sanitary sewer trunk line; bids are to be submitted to the City Finance Director and will be publicly opened at City Hall. A pre-bid conference will be held (attendance optional). Contract documents are available free from the City Engineering Department (Tel: 575-397-9232).
Sewer replacement 1. Vinyl plank install 2. Tub/surround replacement 3. Paint entire unit 4. Plumbing fixture and vanity replacement 5. Cabinet and countertop/sin reinstallation or replacement 6. Wiring, breaker and receptacle replacement 7. Waste line replacement.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Sewer replacement 1. Vinyl plank install 2. Tub/surround replacement 3. Paint entire unit 4. Plumbing fixture and vanity replacement 5. Cabinet and countertop/sin reinstallation or replacement 6. Wiring, breaker and receptacle replacement 7. Waste line replacement.
AvailableWork include sewage pumping when required; track time flagging fees; furnish and install manhole san-01 and piping up to SAN-02; furnish and install SAN-02, 15" dip piping, 24" steel casing up to and including SAN-03. bore and Jack the casing pipe under main line railroad; Furnish and install piping and remaining manholes from SAN-03 up to the existing manhole SAN-06; repair and repave the existing drive if required; miscellaneous clean-up activities.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
Work include sewage pumping when required; track time flagging fees; furnish and install manhole san-01 and piping up to SAN-02; furnish and install SAN-02, 15" dip piping, 24" steel casing up to and including SAN-03. bore and Jack the casing pipe under main line railroad; Furnish and install piping and remaining manholes from SAN-03 up to the existing manhole SAN-06; repair and repave the existing drive if required; miscellaneous clean-up activities.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis