Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
872 LF sewer line replacement, 6 manholes, 13 service connections, & 520 LF surface repair.
Posted Date
Jan 17, 2026
Due Date
Feb 10, 2026
Release: Jan 17, 2026
Close: Feb 10, 2026
872 LF sewer line replacement, 6 manholes, 13 service connections, & 520 LF surface repair.
AvailableWork includes installation of new 4" HDPE sewer line by underground boring, connecting the existing line at the soccer fields to the existing line beyond the playground/shelter area. Bore approx 600 LF of 4" HDPE sewer pipe connecting the two locations. See attached file.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Work includes installation of new 4" HDPE sewer line by underground boring, connecting the existing line at the soccer fields to the existing line beyond the playground/shelter area. Bore approx 600 LF of 4" HDPE sewer pipe connecting the two locations. See attached file.
AvailableSewer line replacement services.
Posted Date
Jan 8, 2026
Due Date
Feb 2, 2026
Release: Jan 8, 2026
Close: Feb 2, 2026
Sewer line replacement services.
AvailableWork consists of involves sewer line point repair main sewer line infrastructure. Work includes, 35 LF of replace 8" pipe w/ sdr-35; 20 LF of replace 8" pipe w/ sdr-35; 10 LF of replace 8" pipe w/ sdr-35 upstream from mh 36a750.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Work consists of involves sewer line point repair main sewer line infrastructure. Work includes, 35 LF of replace 8" pipe w/ sdr-35; 20 LF of replace 8" pipe w/ sdr-35; 10 LF of replace 8" pipe w/ sdr-35 upstream from mh 36a750.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis