Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Install a new sanitary sewer, storm sewer, and water main on road. Including 6 LF of 8" PVC mainline sanitary sewer; 24 LF of 12" PVC mainline sanitary sewer; 1,500 LF of 12" PVC mainline sanitary sewer; 75 LF of 6' storm sewer; 6 LF 10" storm sewer; 170 LF of 12' storm sewer; 12 LF 15" storm sewer; 6 LF of 18' storm sewer; 6 LF 10" storm sewer; 515 LF of 42' storm sewer; 6 LF 10" storm sewer; 835 LF of 6' storm sewer; 6 LF 48" storm sewer; 6 ea of 48' sanitary manhole; 1 ea 60' storm manhole; 5 ea 72' storm manhole; 1 ea 96' storm manhole; 2,220 SF concrete drive aprons; 5,890 SF concrete sidewalks; 604 of 8' watermain w/polyethylene encasement; 70 LF of 12' watermain W/polyethylene Encasement; 1 ea hydrant assemblies removed and reset; 1 ea hydrant assemblies; 1,500 LF ODOT 452 non-reinforced portland cement concrete pavement. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Nov 14, 2025
Close: Dec 15, 2025
Bridge replacement.
AvailableProcurement of services for Fayetteville Rd. re-conduction and pole replacement.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Procurement of services for Fayetteville Rd. re-conduction and pole replacement.
AvailableWork includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis