Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove and replace twenty- four (24) fire hydrants, connections to existing facilities, abandonment of existing facilities, erosion control, asphalt removal & replacement, concrete removal & replacement, site restoration to a condition equal to or better than the existing condition at the start of construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacement of sixteen (16) Eddy Fire Hydrants with East Jordan (EJ) 250 Fire Hydrants.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Replacement of sixteen (16) Eddy Fire Hydrants with East Jordan (EJ) 250 Fire Hydrants.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Fire Hydrant Project.
Posted Date
Dec 12, 2025
Due Date
Jan 16, 2026
Release: Dec 12, 2025
Close: Jan 16, 2026
Fire Hydrant Project.
AvailableThe Ohio Department of Behavioral Health (DBH) is soliciting quotes to replace a fire hydrant assembly, including coordination with the Toledo Water Department and Ohio Underground Protection Services, excavation, removal and disposal, installation of a new 5¼" hydrant assembly, thrust block installation as necessary, backfill, and flow testing. The contract will be awarded to the lowest-cost responsive and responsible supplier, who must include all applicable costs for delivery, setup, and warranty. Contact: Donald McGuire (419-392-2211).
Posted Date
Dec 12, 2025
Due Date
Jan 16, 2026
Release: Dec 12, 2025
Close: Jan 16, 2026
The Ohio Department of Behavioral Health (DBH) is soliciting quotes to replace a fire hydrant assembly, including coordination with the Toledo Water Department and Ohio Underground Protection Services, excavation, removal and disposal, installation of a new 5¼" hydrant assembly, thrust block installation as necessary, backfill, and flow testing. The contract will be awarded to the lowest-cost responsive and responsible supplier, who must include all applicable costs for delivery, setup, and warranty. Contact: Donald McGuire (419-392-2211).
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →