Denver International Airport
Replace deteriorated concrete pavement at taxiways CN, CS and H. The project will remove and replace 17” thick concrete slabs on DEN’s airfield that are at the end of their useful life and are identified in the pavement asset management database. Additionally, other scopes of work include pavement spall and crack repairs, striping, and inlet repair.
Release
Jan 13, 2025
Close
Feb 06, 2025