Nas Whiting Field Airfield Pavement Repairs
Construction may include, but is not limited to, repairing the airfield pavement by mill, overlay, and restripe pavement sections. Approximate total concrete pavement repair area is approx. 800,000 SY. Repairs will include barricades, saw cutting, milling, asphalt overlay, sweeping and preparing pavement surfaces. Minor repairs to concrete pavement include spall repair and joint replacement. The grade adjacent to the runway shoulder pavement edges will be re-graded, compacted and sodded for positive drainage. All airfield pavement markings will be replaced and the airfield lighting removed and replaced as required, reinstalled and adjusted to enable milling and overlay