Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 27,000 SY remove bituminous pavement 10,200 LF remove and replace concrete curb and gutter 2,900 LF remove storm sewer pipe 5,390 LF remove sanitary sewer pipe 5,380 LF remove watermain pipe 9,650 CY excavation common (p) 9,850 CY excavation subgrade (p) 1 ls excavation rock 1,000 CY common embankment (CV) 4,850 ton type SP 9. 5 wearing course mix (3,c) 2,300 ton type SP 12. 5 non wear course mix (3,c) 36,600 SF 3" bituminous walk 5,650 LF 8" 10" PVC sanitary sewer 4,040 LF 15" 36" RCP storm sewer 6,870 LF 4" 8" dip watermain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Street reconstruction project.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Street reconstruction project.
AvailableThe project includes waterline, storm sewer, curb and gutter, sidewalk, and street improvements. Also included are improvements to parking lots within the Village.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
The project includes waterline, storm sewer, curb and gutter, sidewalk, and street improvements. Also included are improvements to parking lots within the Village.
AvailableNew paving, sanitary sewer, watermain and storm sewer. There is an HMA option for this project. 9,895 SY - subgrade, modified 6"; 245 LF - sanitary sewer gravity main, trenched, PVC SDR 62, 6"; 200 LF - remove of sanitary sewer, VCP, 8"; 445 LF - sanitary sewer abandonment, fill and plug, 8"; 156 LF - storm sewer, trenched, RCP, 15"; 20 ea - fitting, DI 8" 90-deg bend; 5 ea - fitting, DI, 8" CAP; 1 ea - water services strub, PVC, 1.5". See outside link.
Posted Date
Dec 2, 2025
Due Date
Dec 23, 2025
Release: Dec 2, 2025
Close: Dec 23, 2025
New paving, sanitary sewer, watermain and storm sewer. There is an HMA option for this project. 9,895 SY - subgrade, modified 6"; 245 LF - sanitary sewer gravity main, trenched, PVC SDR 62, 6"; 200 LF - remove of sanitary sewer, VCP, 8"; 445 LF - sanitary sewer abandonment, fill and plug, 8"; 156 LF - storm sewer, trenched, RCP, 15"; 20 ea - fitting, DI 8" 90-deg bend; 5 ea - fitting, DI, 8" CAP; 1 ea - water services strub, PVC, 1.5". See outside link.
The existing roadway pavement will be removed and replaced with PCC pavement, which will include the preparation of subbase material. Storm sewer piping will be added, storm sewer structures will be replaced and added, and watermain will be updated under a portion of the project corridor. Sanitary Sewer services along Giles Street will be replaced on an as needed basis. Affected driveway approaches will be replaced, all sidewalk will be replaced, and sidewalk curb ramps will be modified to be ADA compliant. A portion of watermain will be updated and upsized. The project also includes surface restoration, traffic control and other related work.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
The existing roadway pavement will be removed and replaced with PCC pavement, which will include the preparation of subbase material. Storm sewer piping will be added, storm sewer structures will be replaced and added, and watermain will be updated under a portion of the project corridor. Sanitary Sewer services along Giles Street will be replaced on an as needed basis. Affected driveway approaches will be replaced, all sidewalk will be replaced, and sidewalk curb ramps will be modified to be ADA compliant. A portion of watermain will be updated and upsized. The project also includes surface restoration, traffic control and other related work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis