Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Sioux City
New paving, sanitary sewer, watermain and storm sewer. There is an HMA option for this project. 9,895 SY - subgrade, modified 6"; 245 LF - sanitary sewer gravity main, trenched, PVC SDR 62, 6"; 200 LF - remove of sanitary sewer, VCP, 8"; 445 LF - sanitary sewer abandonment, fill and plug, 8"; 156 LF - storm sewer, trenched, RCP, 15"; 20 ea - fitting, DI 8" 90-deg bend; 5 ea - fitting, DI, 8" CAP; 1 ea - water services strub, PVC, 1.5". See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Waterloo
Street reconstruction project.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
City of Waterloo
Close: Dec 18, 2025
Street reconstruction project.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Darke County
The project includes waterline, storm sewer, curb and gutter, sidewalk, and street improvements. Also included are improvements to parking lots within the Village.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Darke County
Close: Dec 18, 2025
The project includes waterline, storm sewer, curb and gutter, sidewalk, and street improvements. Also included are improvements to parking lots within the Village.
AvailableCity of Santa Paula
Provide solar-powered street lighting poles and fixtures. Bid must include a lighting diagram for the 1260' x 45' road segment to demonstrate placement of fixtures and coverage.
Posted Date
Nov 18, 2025
Due Date
Dec 11, 2025
Release: Nov 18, 2025
City of Santa Paula
Close: Dec 11, 2025
Provide solar-powered street lighting poles and fixtures. Bid must include a lighting diagram for the 1260' x 45' road segment to demonstrate placement of fixtures and coverage.
AvailableCity of Greenville
DODGE, JAMES AND GROVE STREET RECONSTRUCTION work. The Project includes removal and replacement of approx. 0.39 miles of existing road within the same footprint. Installation items include 1,972 LF of 8" sanitary sewer with 8 precast concrete manholes and castings; 451 LF of 12" Cl A storm sewer with 5 precast concrete manholes and covers; 2,066 LF of 8" ductile iron water main, 3 fire hydrants, 12 valves and associated fittings; replacement of 43 water service lines; 3,668 LF of concrete curb and gutter; 526 square yards of driveway; 1,336 square feet of concrete sidewalk; 5,556 square yards of aggregate base; 916 tons of HMA surfacing and 0.5 acres of restoration. The project also includes traffic control devices.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
City of Greenville
Close: Dec 9, 2025
DODGE, JAMES AND GROVE STREET RECONSTRUCTION work. The Project includes removal and replacement of approx. 0.39 miles of existing road within the same footprint. Installation items include 1,972 LF of 8" sanitary sewer with 8 precast concrete manholes and castings; 451 LF of 12" Cl A storm sewer with 5 precast concrete manholes and covers; 2,066 LF of 8" ductile iron water main, 3 fire hydrants, 12 valves and associated fittings; replacement of 43 water service lines; 3,668 LF of concrete curb and gutter; 526 square yards of driveway; 1,336 square feet of concrete sidewalk; 5,556 square yards of aggregate base; 916 tons of HMA surfacing and 0.5 acres of restoration. The project also includes traffic control devices.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →