Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1. Remove concrete, curb, and ramp/walkway on east side of building leading to the top floor of building. 2. Fill in elevator shaft/pit at bottom floor level (possible 4' to 5' deep) 3. Remove steps on southwest side of building all the way up on outside of building. 4. All planter walls/raised planters need to be removed. 5. Chiller pad needs to be removed on north end of building on the outside of building. 6. Remove all bench rails and supports around building perimeter. 7. Remove sign post at the front of building near the handicap ramp. 8. Remove monument sign. 9. Foundation, slab and retainage wall may remain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Abatement of asbestos-containing materials, hazardous materials, polychlorinated biphenyls (PCBs) and universal waste, and demolition and removal of the former Marshall elementary school building, and abandon/removal of utilities and restoration of the site.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
Abatement of asbestos-containing materials, hazardous materials, polychlorinated biphenyls (PCBs) and universal waste, and demolition and removal of the former Marshall elementary school building, and abandon/removal of utilities and restoration of the site.
AvailableRelease: Nov 23, 2025
Close: Jan 21, 2026
Demolition of the structure.
AvailableDemolition of five buildings. Work includes complete demolition, removal of all debris, and removal and disposal of all concrete slabs. The project includes three metal buildings (A, C, and D), one wooden building (B), and one concrete block building (E).
Posted Date
Jan 15, 2026
Due Date
Jan 23, 2026
Release: Jan 15, 2026
Close: Jan 23, 2026
Demolition of five buildings. Work includes complete demolition, removal of all debris, and removal and disposal of all concrete slabs. The project includes three metal buildings (A, C, and D), one wooden building (B), and one concrete block building (E).
AvailableProcurement for the demolition and removal of the Old City Hall and Municipal Court building, including the structure, slab, foundations, footings, inground plumbing, debris removal, and site leveling.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Procurement for the demolition and removal of the Old City Hall and Municipal Court building, including the structure, slab, foundations, footings, inground plumbing, debris removal, and site leveling.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis