Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves providing approximately 800 linear feet of 8-inch SDR35 PVC gravity sewer, sanitary sewer manholes, approximately 300 linear feet of 6-inch SDR35 PVC service connection piping, approximately 65 linear feet of 8-inch SDR35 PVC service connection piping, and connection to an existing gravity manhole on Windermere Avenue. Additionally, it includes removing and resetting or replacing existing site improvements, restoring disturbed areas, and replacing bituminous concrete on Town Roads.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of sewer extension.
Posted Date
Sep 14, 2025
Due Date
Feb 5, 2026
Release: Sep 14, 2025
Close: Feb 5, 2026
Project consists of sewer extension.
AvailableThe project is for the installation of HDPE pipe via the pipe bursting method of approx. 1,000 LF of existing 8" sewer along the 600 block of Lexington Avenue and 1st Street between Lexington Avenue and Holland Avenue, manhole rehabilitation of three (3) manholes, reconnection and replacement of sewer services and pavement restoration, located in the Avenues subdivision of Cayce.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
The project is for the installation of HDPE pipe via the pipe bursting method of approx. 1,000 LF of existing 8" sewer along the 600 block of Lexington Avenue and 1st Street between Lexington Avenue and Holland Avenue, manhole rehabilitation of three (3) manholes, reconnection and replacement of sewer services and pavement restoration, located in the Avenues subdivision of Cayce.
AvailableAmherst County is soliciting bids for the Berkshire Sanitary Sewer Extension, a construction project to extend sanitary sewer infrastructure. The solicitation is an Invitation for Bid (IFB) and includes bid documents and drawings available from the buyer’s vendor portal. Bids are due January 22, 2026 and the solicitation is open as of 2025-12-24.
Posted Date
Dec 22, 2025
Due Date
Jan 22, 2026
Release: Dec 22, 2025
Close: Jan 22, 2026
Amherst County is soliciting bids for the Berkshire Sanitary Sewer Extension, a construction project to extend sanitary sewer infrastructure. The solicitation is an Invitation for Bid (IFB) and includes bid documents and drawings available from the buyer’s vendor portal. Bids are due January 22, 2026 and the solicitation is open as of 2025-12-24.
AvailableWork on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Work on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis