Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lewes Public Library
Seeking proposals from qualified firms for the design, supply, implementation, and support of an Automated Metering Infrastructure (AMI) System.
Posted Date
May 31, 2026
Due Date
Aug 28, 2026
Release: May 31, 2026
Lewes Public Library
Close: Aug 28, 2026
Seeking proposals from qualified firms for the design, supply, implementation, and support of an Automated Metering Infrastructure (AMI) System.
AvailableLewes Public Library
Consists of erosion and sediment control measures, approx. 630 LF of SDR 9 water service pipe, 31 curb stop valves, valve boxes and corporation stop tap valves, 1,725 LF of 8" PVC water main installed by open cut, 8" gate valves, 2 fire hydrants with 6" leads and 6" gate valves, 19 water meters and vaults, abandonment of existing wells, abandon in place existing water main, 765 LF of 8" sanitary sewer gravity main by open cut, 1,200 LF of 1.5" SDR 11 HDPE force main, 2,145 LF of 6" PVC sanitary sewer laterals, 30 6" sanitary sewer lateral cleanouts with frames & covers, 30 vertical feet of 4-foot sanitary sewer manholes complete with frames and covers, line brick manholes with layer stress skin panel (totaling 25 vertical feet), abandoning 11 septic system tanks, CIP lining of 17 existing laterals, CIP lining of 950 LF of existing 8" PVC sewer main, removal of existing wet well, installing new proposed pump station, 4100 SY of 1.5" superpave “Type C” surface course, and “Type B” base course asphalt, 920 CY of 8" GABC, 220 CY of 11.5" graded aggregate base course for permanent trench repair, 60 SY of 6" private concrete driveway replacement and private property restoration The work consists of the furnishing of all labor, materials, transportation, tools, supplies, and equipment necessary to complete the project.
Posted Date
Mar 4, 2026
Due Date
Apr 2, 2026
Release: Mar 4, 2026
Lewes Public Library
Close: Apr 2, 2026
Consists of erosion and sediment control measures, approx. 630 LF of SDR 9 water service pipe, 31 curb stop valves, valve boxes and corporation stop tap valves, 1,725 LF of 8" PVC water main installed by open cut, 8" gate valves, 2 fire hydrants with 6" leads and 6" gate valves, 19 water meters and vaults, abandonment of existing wells, abandon in place existing water main, 765 LF of 8" sanitary sewer gravity main by open cut, 1,200 LF of 1.5" SDR 11 HDPE force main, 2,145 LF of 6" PVC sanitary sewer laterals, 30 6" sanitary sewer lateral cleanouts with frames & covers, 30 vertical feet of 4-foot sanitary sewer manholes complete with frames and covers, line brick manholes with layer stress skin panel (totaling 25 vertical feet), abandoning 11 septic system tanks, CIP lining of 17 existing laterals, CIP lining of 950 LF of existing 8" PVC sewer main, removal of existing wet well, installing new proposed pump station, 4100 SY of 1.5" superpave “Type C” surface course, and “Type B” base course asphalt, 920 CY of 8" GABC, 220 CY of 11.5" graded aggregate base course for permanent trench repair, 60 SY of 6" private concrete driveway replacement and private property restoration The work consists of the furnishing of all labor, materials, transportation, tools, supplies, and equipment necessary to complete the project.
Lewes Public Library
Work on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Lewes Public Library
Close: Jan 15, 2026
Work on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lewes Public Library
The board discussed facility maintenance including completed HVAC repairs and AV upgrades, as well as upcoming budget planning for the next fiscal year. Reports were provided on the annual development campaign, human resources handbook reviews, and library funding advocacy efforts. Policy revisions were approved for pavilion accessibility, acceptable behavior, service animals, and pavilion weather procedures. The board also addressed future rental fee structures for meeting room usage by organizations hosting children's programs.
The board reviewed financial reports and the fundraising update. An executive session was conducted to address an incident and policy regarding acceptable behavior. Committee reports included updates on the board match and annual appeal, progress on employee handbook revisions, and development of pavilion policies. Other key discussion topics included legislative advocacy regarding library funding, updates on the Friends of the Library membership campaign and upcoming book sale, revisions to pavilion accessibility policies, and a decision to file a worker's compensation claim for a recent staff incident. The board also discussed potential staff compensation adjustments and the addition of a part-time administrative assistant.
The board discussed financial reports, noting that revenues are ahead of budget while expenses remain below. Fundraising updates indicated that while the number of donors has decreased, the total donation amount is higher than in the previous year. The Director's report highlighted a strategic shift toward fewer, high-quality programs, the hiring of a new teen librarian, and security updates. Committee reports covered revisions to the personnel policy, progress on annual appeals, website content updates, and potential 10th-anniversary celebration planning. Additionally, the board approved a revised Pavilion Committee Charter and new meeting room fees. The meeting concluded with an executive session regarding a real estate matter.
The board discussed the library tax advocacy effort, including participation from various libraries, feedback received, and the determination of subsequent actions.
The meeting was held to evaluate the status of the library advocacy campaign and to determine future steps. Participants expressed concerns regarding the limited progress of the campaign to increase the county library tax, noting that the public and county council members do not yet fully understand the funding challenges faced by independent libraries in Sussex County.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lewes Public Library's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge