Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes the following Work: Sanitary Sewer Lining of approx 5,500 LF of sanitary sewer.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
6 LF - 10" sanitary sewer spot lining; 105 LF - 8" sanitary sewer spot lining; 2 unit - reinstate sanitary connection; 1 unit - sanitary sewer mainline grouting setup, 15"-18".
Posted Date
Dec 16, 2025
Due Date
Jan 12, 2026
Release: Dec 16, 2025
Close: Jan 12, 2026
6 LF - 10" sanitary sewer spot lining; 105 LF - 8" sanitary sewer spot lining; 2 unit - reinstate sanitary connection; 1 unit - sanitary sewer mainline grouting setup, 15"-18".
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide all labor, services and materials necessary for the televising, cleaning and CIPP lining of approx two thousand eight hundred ten (2,810) LF of sanitary sewer pipe; and all other work necessary for a complete and functional sanitary sewer cleaning and lining project
Posted Date
Dec 22, 2025
Due Date
Jan 22, 2026
Release: Dec 22, 2025
Close: Jan 22, 2026
Provide all labor, services and materials necessary for the televising, cleaning and CIPP lining of approx two thousand eight hundred ten (2,810) LF of sanitary sewer pipe; and all other work necessary for a complete and functional sanitary sewer cleaning and lining project
AvailableWork include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
AvailableInstallation of cured in place pipe (CIPP) liners within existing sanitary sewer pipes, pre- and post-liner video inspection, internal reinstatement of service laterals, cleaning and preparing the existing host pipes, and incidental items.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
Installation of cured in place pipe (CIPP) liners within existing sanitary sewer pipes, pre- and post-liner video inspection, internal reinstatement of service laterals, cleaning and preparing the existing host pipes, and incidental items.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →