Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
6 LF - 10" sanitary sewer spot lining; 105 LF - 8" sanitary sewer spot lining; 2 unit - reinstate sanitary connection; 1 unit - sanitary sewer mainline grouting setup, 15"-18".
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Premium
Access the largest public sector contact database
Close: Jan 14, 2026
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
AvailableThe City of Edwardsville is soliciting contractors to perform sewer lining services (cleaning, inspection, and cured-in-place pipe lining/CIPP) as part of its 2025 sewer lining contract. Bids are to be submitted to the City Clerk by the published closing date and related bid documents are available from the City via the plan-holders form.
Posted Date
Nov 21, 2025
Due Date
Jan 9, 2026
Release: Nov 21, 2025
Close: Jan 9, 2026
The City of Edwardsville is soliciting contractors to perform sewer lining services (cleaning, inspection, and cured-in-place pipe lining/CIPP) as part of its 2025 sewer lining contract. Bids are to be submitted to the City Clerk by the published closing date and related bid documents are available from the City via the plan-holders form.
AvailableThe City of Jacksonville (NC) has posted an RFB titled 'RFB-FY 23-24 Sanitary Sewer Rehabilitation CIPP Lining' to procure cured-in-place pipe (CIPP) lining and related sanitary sewer rehabilitation services. The BidNet posting lists publication date 2025-12-03 and a bid/closing date of 2026-01-13 at 3:00 PM EST, and the solicitation documents and buyer contact details are available to registered BidNet users. No separate buyer-hosted solicitation PDF or Doc was found on the City’s public website; public aggregators note the City as the owner and provide additional project summary details (e.g., pre-bid conference and DBE goal).
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
The City of Jacksonville (NC) has posted an RFB titled 'RFB-FY 23-24 Sanitary Sewer Rehabilitation CIPP Lining' to procure cured-in-place pipe (CIPP) lining and related sanitary sewer rehabilitation services. The BidNet posting lists publication date 2025-12-03 and a bid/closing date of 2026-01-13 at 3:00 PM EST, and the solicitation documents and buyer contact details are available to registered BidNet users. No separate buyer-hosted solicitation PDF or Doc was found on the City’s public website; public aggregators note the City as the owner and provide additional project summary details (e.g., pre-bid conference and DBE goal).
AvailableWork includes 2,307 LF 20" vitrified clay pipe, installation of liners in existing sanitary and combined sewers by trenchless methods using cured-in-placed pipe, determine sewer flows and bypass pumping required, HEAVY cleaning the sewer, disposal of debris from heavy cleaning, divert sewer flow, pre insertion internal CCTV inspection, spot repairs as required, public notification, install the liner, reinstate internal laterals/service connections, post insertion CCTV inspection, and traffic control.
Posted Date
Dec 17, 2025
Due Date
Jan 7, 2026
Release: Dec 17, 2025
Close: Jan 7, 2026
Work includes 2,307 LF 20" vitrified clay pipe, installation of liners in existing sanitary and combined sewers by trenchless methods using cured-in-placed pipe, determine sewer flows and bypass pumping required, HEAVY cleaning the sewer, disposal of debris from heavy cleaning, divert sewer flow, pre insertion internal CCTV inspection, spot repairs as required, public notification, install the liner, reinstate internal laterals/service connections, post insertion CCTV inspection, and traffic control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis