Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sewer Cleaning & CCTV Investigation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 19, 2025
Close: Jan 20, 2026
Sewer Cleaning and CCTV Investigation.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Light cleaning of sewer segments to be inspected, inspecting sewer segments by means of closed-circuit television (CCTV), and providing reports of CCTV inspections at locations.
Posted Date
Dec 17, 2025
Due Date
Jan 2, 2026
Release: Dec 17, 2025
Close: Jan 2, 2026
Light cleaning of sewer segments to be inspected, inspecting sewer segments by means of closed-circuit television (CCTV), and providing reports of CCTV inspections at locations.
AvailableInclude: the installation of approx. 17,546 LF of 8" cured-in-place pipe (CIPP), 780 LF of 10" CIPP, and 73 LF of 15" CIPP in sanitary, storm, and combined sewers, and one (1) known point repair of approx. 10 LF of 10" sanitary sewer. The work shall include sewer cleaning, pre- and post- CCTV inspections of the sewers, lateral reinstatements, and removal of protruding laterals as required.
Posted Date
Nov 21, 2025
Due Date
Jan 6, 2026
Release: Nov 21, 2025
Close: Jan 6, 2026
Include: the installation of approx. 17,546 LF of 8" cured-in-place pipe (CIPP), 780 LF of 10" CIPP, and 73 LF of 15" CIPP in sanitary, storm, and combined sewers, and one (1) known point repair of approx. 10 LF of 10" sanitary sewer. The work shall include sewer cleaning, pre- and post- CCTV inspections of the sewers, lateral reinstatements, and removal of protruding laterals as required.
AvailableWork includes 2,307 LF 20" vitrified clay pipe, installation of liners in existing sanitary and combined sewers by trenchless methods using cured-in-placed pipe, determine sewer flows and bypass pumping required, HEAVY cleaning the sewer, disposal of debris from heavy cleaning, divert sewer flow, pre insertion internal CCTV inspection, spot repairs as required, public notification, install the liner, reinstate internal laterals/service connections, post insertion CCTV inspection, and traffic control.
Posted Date
Dec 17, 2025
Due Date
Jan 7, 2026
Release: Dec 17, 2025
Close: Jan 7, 2026
Work includes 2,307 LF 20" vitrified clay pipe, installation of liners in existing sanitary and combined sewers by trenchless methods using cured-in-placed pipe, determine sewer flows and bypass pumping required, HEAVY cleaning the sewer, disposal of debris from heavy cleaning, divert sewer flow, pre insertion internal CCTV inspection, spot repairs as required, public notification, install the liner, reinstate internal laterals/service connections, post insertion CCTV inspection, and traffic control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →