CityAL
Aug 7, 2026
Closes
Sep 1, 2026
Sweetwater Interceptor Sewer
Sweetwater interceptor sewer.
Description: The Glen Echo Interceptor Relief Sewer project is an Invitation for Bid for construction of a sewer relief system in Edgemere (District 15c7), including installation of a new sewer line, pump station, excavation/backfill, and associated pipe and fittings. The project follows Baltimore County standard construction specifications, has an approximate duration of 382 days, and the listing indicates an estimated budget range of $5,000,000–$10,000,000.
County · MD, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Baltimore County.
Adjacent opportunities open for bidding right now.
CityAL
Aug 7, 2026
Closes
Sep 1, 2026
Sweetwater interceptor sewer.
CityNV
Jul 30, 2026
Closes
Aug 26, 2026
Work incldues excavation and installation of approx 5,074 LF of sewer, and associated work and appurtenances.
CityNJ
Aug 10, 2026
Closes
Aug 25, 2026
Work consists of approx 8,000 LF of 24" and 1,000 LF of 20" sanitary sewer pipes Multi Sensor Inspection (MSI) methods. The multi sensor inspection consists of CCTV, lidar and sonar inspection. Additionally, CCTV inspection will be performed for approximately 1,600 LF of 14" sanitary sewer pipes.
Bay Shore Regional Sewerage Authority
Special DistrictNJ
Jul 24, 2026
Closes
Sep 1, 2026
Work generally includes the following: trenchless rehabilitation of existing sanitary sewer interceptors and manholes at two locations utilizing cured-in-place pipe lining (CIPPL). Provision, installation, and maintenance of temporary bypass pumps and piping to maintain sanitary sewer service of the upstream and affected properties and connections. Installation and maintenance of temporary bypass piping ramps as required when bypass piping crosses the municipal right of way and driveways. Provision and maintenance of temporary traffic control measures to ensure safe vehicular and pedestrian access around the project site. Additional items shown on the contract documents.