Special DistrictTN
Posted
Sep 16, 2026
Sep 23, 2026
2026 Dickson City Center Natural Gas Line Relocation RFP
This project consists of the installation of approx. 1500 LF of 6" and 4" steel natural gas line within the City Center.
Description: Work includes approx 663 LF of 2" high pressure steel natural gas distribution line. This contract will consist generally of, but shall not be limited to, the following items: erosion control including compliance with the existing ARAP, traffic control, construction of natural gas distribution line by open cut method and by bore/HDD method under Blue Creek, fittings, testing, coordination with the Owner, property owners, and other contractors on site, purging and removal or retirement of existing lines as indicated in the drawings and directed by the Owner, surveying, layout, finish grading, respreading topsoil, and site cleanup. Project shall also include all costs of clearing rights-of-way and easements as required to construct the natural gas pipeline.
SpecialDistrict · TN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Humphreys County Utility District.
Adjacent opportunities open for bidding right now.
Special DistrictTN
Posted
Sep 16, 2026
Sep 23, 2026
This project consists of the installation of approx. 1500 LF of 6" and 4" steel natural gas line within the City Center.
CountyNY
Posted
Sep 5, 2026
Oct 7, 2026
Replacement with a new truss superstructure supported on concrete abutments. Heavy stone fill will be placed in the vicinity of the wing walls and along West Creek. Steel four-rail bridge rail shall be installed. This project will incorporate full-depth pavement reconstruction.
CountyCA
Posted
Aug 12, 2026
Sep 29, 2026
Work consists of bridge replacement, includes 1,400 LF of temporary silt fence; 12,000 SF of remove existing HMA; 200 CY of roadway excavation; 4,350 CY of imported borrow; 551 CY of structure excavation, bridge; 150 CY of structure backfill, bridge; 31,145 SF of erosion control; 666 CY of aggregate base; 475 TON of hot mix asphalt (type b); 2,510 LF of furnish piling, bridgel; 1,900 LF of thermoplastic traffic stripe - detail 27b; 700 LF of thermoplastic traffic stripe - detail 21; 230 LF of guardrail system (wood post); 77 SF of pavement marking.
CityNC
Posted
Sep 9, 2026
Oct 1, 2026
Work includes approx 665 LF of 6" steel natural gas mains and associated appurtenances. The method of installation for the mains shall be direct bury.