2" Natural Gas Line Relocation on Bold Springs Road over Blue Creek
Posted
Sep 9, 2026
Sep 24, 2026
Work includes approx 663 LF of 2" high pressure steel natural gas distribution line. This contract will consist generally of, but shall not be limited to, the following items: erosion control including compliance with the existing ARAP, traffic control, construction of natural gas distribution line by open cut method and by bore/HDD method under Blue Creek, fittings, testing, coordination with the Owner, property owners, and other contractors on site, purging and removal or retirement of existing lines as indicated in the drawings and directed by the Owner, surveying, layout, finish grading, respreading topsoil, and site cleanup. Project shall also include all costs of clearing rights-of-way and easements as required to construct the natural gas pipeline.