Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of West Des Moines, Iowa is soliciting bids for construction of the 1st Street Raccoon River Trail (Project No. 0510-049-2024). Work includes excavation, reinforced concrete pavement, HMA pavement, pipe culverts, erosion control and site restoration per plans and specifications prepared by I&S Group, Inc., with work to begin within ten days of notice to proceed and to be completed by September 30, 2026. Bids are due January 21, 2026 and the solicitation is a Request for Bid (not a grant).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of South San Francisco (Public Works/Engineering Division) requests sealed bids for construction of several short pedestrian and bicycle pathway connections along the Centennial Trail near 1st Street to formalize desire paths, improve safety, accessibility, and continuity. Work includes demolition, grading, asphalt path installation (~165 ft x 8 ft), limited concrete sidewalks, curb modifications, detectable warnings, bollards, and compliance with City standards, Caltrans specs, and ADA. The project schedule requires work to begin within 15 calendar days of contract approval and completion within 60 working days; a non-mandatory pre-bid meeting and question deadlines are listed on the buyer site.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Close: Jan 23, 2026
The City of South San Francisco (Public Works/Engineering Division) requests sealed bids for construction of several short pedestrian and bicycle pathway connections along the Centennial Trail near 1st Street to formalize desire paths, improve safety, accessibility, and continuity. Work includes demolition, grading, asphalt path installation (~165 ft x 8 ft), limited concrete sidewalks, curb modifications, detectable warnings, bollards, and compliance with City standards, Caltrans specs, and ADA. The project schedule requires work to begin within 15 calendar days of contract approval and completion within 60 working days; a non-mandatory pre-bid meeting and question deadlines are listed on the buyer site.
AvailableWork consists of construction of select pavement removal, new concrete trail, vegetation clearing, storm and water main work, asphalt, curb, gutter and sidewalk, new retaining walls, fencing, guardrail, signage, pavement marking, landscaping, electric work including pedestrian scale site lighting, and site amenities.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Work consists of construction of select pavement removal, new concrete trail, vegetation clearing, storm and water main work, asphalt, curb, gutter and sidewalk, new retaining walls, fencing, guardrail, signage, pavement marking, landscaping, electric work including pedestrian scale site lighting, and site amenities.
AvailableConstructing 4,100 LF of trail over the existing railroad grade. Work includes, but is not limited to, removal of existing railroad ties and railroad crossing at 6th street, clearing and grubbing, placement of limestone screenings, segments of asphalt paving, topsoil cap placement, sidewalk and curb ramp construction, signing, site restoration, and associated work.
Posted Date
Dec 30, 2025
Due Date
Jan 15, 2026
Release: Dec 30, 2025
Close: Jan 15, 2026
Constructing 4,100 LF of trail over the existing railroad grade. Work includes, but is not limited to, removal of existing railroad ties and railroad crossing at 6th street, clearing and grubbing, placement of limestone screenings, segments of asphalt paving, topsoil cap placement, sidewalk and curb ramp construction, signing, site restoration, and associated work.
AvailableConstruction of a section of the central delaware waterfront trail, connecting penn treaty park to the battery along the delaware river in philadelphia, PA.
Posted Date
Dec 22, 2025
Due Date
Jan 23, 2026
Release: Dec 22, 2025
Close: Jan 23, 2026
Construction of a section of the central delaware waterfront trail, connecting penn treaty park to the battery along the delaware river in philadelphia, PA.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis