Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Constructing 4,100 LF of trail over the existing railroad grade. Work includes, but is not limited to, removal of existing railroad ties and railroad crossing at 6th street, clearing and grubbing, placement of limestone screenings, segments of asphalt paving, topsoil cap placement, sidewalk and curb ramp construction, signing, site restoration, and associated work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of West Des Moines, Iowa is soliciting bids for construction of the 1st Street Raccoon River Trail (Project No. 0510-049-2024). Work includes excavation, reinforced concrete pavement, HMA pavement, pipe culverts, erosion control and site restoration per plans and specifications prepared by I&S Group, Inc., with work to begin within ten days of notice to proceed and to be completed by September 30, 2026. Bids are due January 21, 2026 and the solicitation is a Request for Bid (not a grant).
Posted Date
Jan 6, 2026
Due Date
Jan 21, 2026
Release: Jan 6, 2026
Close: Jan 21, 2026
The City of West Des Moines, Iowa is soliciting bids for construction of the 1st Street Raccoon River Trail (Project No. 0510-049-2024). Work includes excavation, reinforced concrete pavement, HMA pavement, pipe culverts, erosion control and site restoration per plans and specifications prepared by I&S Group, Inc., with work to begin within ten days of notice to proceed and to be completed by September 30, 2026. Bids are due January 21, 2026 and the solicitation is a Request for Bid (not a grant).
AvailableConstruction of a section of the central delaware waterfront trail, connecting penn treaty park to the battery along the delaware river in philadelphia, PA.
Posted Date
Dec 22, 2025
Due Date
Jan 23, 2026
Release: Dec 22, 2025
Close: Jan 23, 2026
Construction of a section of the central delaware waterfront trail, connecting penn treaty park to the battery along the delaware river in philadelphia, PA.
AvailableConstruction of approx. 5.4 miles of Rail Trail; Installation of approx. 1,465 LF of culvert pipe ranging 15" through 36"; Shaping/cleaning of ditches and shoulders for 5.4 miles of Rail Trail; Improvements to four (4) existing rail bridges; Installation of aggregate ballast repair in select areas; Installation of separation fabric, aggregate base course, and aggregate top course for surfacing of the 5.4 miles of Rail Trail; Installation of controlled access gates, signage, bollards, and trail appurtenances; Clearing/grubbing; Excavation/earthwork associated with slip repairs; Restoration Work – Seeding, mulching, disposal of trash/debris.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Construction of approx. 5.4 miles of Rail Trail; Installation of approx. 1,465 LF of culvert pipe ranging 15" through 36"; Shaping/cleaning of ditches and shoulders for 5.4 miles of Rail Trail; Improvements to four (4) existing rail bridges; Installation of aggregate ballast repair in select areas; Installation of separation fabric, aggregate base course, and aggregate top course for surfacing of the 5.4 miles of Rail Trail; Installation of controlled access gates, signage, bollards, and trail appurtenances; Clearing/grubbing; Excavation/earthwork associated with slip repairs; Restoration Work – Seeding, mulching, disposal of trash/debris.
Construction of new connecting trail includes, 3,624 ft of silt fence; 2,058 CY of granular borrow; 12,267 SY of separation geotextile; 4,443 CY of roadway excavation; 57 CY of loose riprap; 101 ft of drainage pipe - 24", metal, silt-tight; 2,318 CY of untreated base course; 2,879 TON of hma - 1/2"; 2,301 ft of concrete curb sloping type; 3,282 ft of 54" ornamental fence; 10 CY of flowable fill - contingency item; 3,698 SY of strip and stockpile salvaged topsoil; 7,651 SY of broadcast seed; 118 gal of pavement marking paint.
Posted Date
Dec 13, 2025
Due Date
Jan 15, 2026
Release: Dec 13, 2025
Close: Jan 15, 2026
Construction of new connecting trail includes, 3,624 ft of silt fence; 2,058 CY of granular borrow; 12,267 SY of separation geotextile; 4,443 CY of roadway excavation; 57 CY of loose riprap; 101 ft of drainage pipe - 24", metal, silt-tight; 2,318 CY of untreated base course; 2,879 TON of hma - 1/2"; 2,301 ft of concrete curb sloping type; 3,282 ft of 54" ornamental fence; 10 CY of flowable fill - contingency item; 3,698 SY of strip and stockpile salvaged topsoil; 7,651 SY of broadcast seed; 118 gal of pavement marking paint.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis