Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of construction of steel sheet pile flood wall and earthen levee. Project also includes modifying existing lift station, installation of storm sewer, concrete pavement, site grading, topsoil placement, and seeding. 1 LS mobilization; 12 EA clearing; 12 EA grubbing; 1,000 CY remove debris; 100 CY common excavation (EV); 80 CY common borrow (CV); 660 CY common import (CV); 275 CY inspection trench (EV); 250 CY salvage topsoil (EV); 50 CY import topsoil (CV); 590 LF steel sheet piling cap; 18,780 SF steel sheet piling (permanent); 17 LF landscape edger; 1 LS traffic control; 1 LS stabilized construction exit; 5 EA storm drain inlet protection; 1,300 LF silt fence; type hi; 40 LF sediment control log type straw; 4,100 SY turf establishment. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking to develop one or more nature-based, natural infrastructure projects to address chronic flooding. Natural infrastructure flood mitigation program (NIFMP) within DMS, incorporating flood storage capacity enhancement projects. The legislation also requires that pilot projects serve as the basis for expanding natural infrastructure flood mitigation projects to additional watersheds and scaling solutions to enhance community resiliency. See attached file for full scope.
Posted Date
Oct 15, 2025
Due Date
Mar 10, 2026
Release: Oct 15, 2025
Close: Mar 10, 2026
Seeking to develop one or more nature-based, natural infrastructure projects to address chronic flooding. Natural infrastructure flood mitigation program (NIFMP) within DMS, incorporating flood storage capacity enhancement projects. The legislation also requires that pilot projects serve as the basis for expanding natural infrastructure flood mitigation projects to additional watersheds and scaling solutions to enhance community resiliency. See attached file for full scope.
AvailableProcurement of services for stormwater improvements and flood mitigation upgrades at the Miami-Dade County Data Processing and Communications Center.
Posted Date
Dec 18, 2025
Due Date
Feb 10, 2026
Release: Dec 18, 2025
Close: Feb 10, 2026
Procurement of services for stormwater improvements and flood mitigation upgrades at the Miami-Dade County Data Processing and Communications Center.
AvailableSeeking qualified engineering consultants. Provide comprehensive planning, design, permitting, public engagement, bidding, and construction-phase services to reduce chronic tidal and storm-related flooding in areas. See attached file.
Posted Date
Dec 31, 2025
Due Date
Mar 13, 2026
Release: Dec 31, 2025
Close: Mar 13, 2026
Seeking qualified engineering consultants. Provide comprehensive planning, design, permitting, public engagement, bidding, and construction-phase services to reduce chronic tidal and storm-related flooding in areas. See attached file.
AvailableSeeking qualified engineering consultants. Provide comprehensive planning, design, permitting, public engagement, bidding, and construction-phase services to reduce chronic tidal and storm-related flooding in areas. See attached file.
Posted Date
Dec 31, 2025
Due Date
Mar 13, 2026
Release: Dec 31, 2025
Close: Mar 13, 2026
Seeking qualified engineering consultants. Provide comprehensive planning, design, permitting, public engagement, bidding, and construction-phase services to reduce chronic tidal and storm-related flooding in areas. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis