Aug 24, 2026
Closes
Sep 24, 2026
Water Distribution System Improvements - Phase 2
Water distribution system improvements - phase 2 including installation of 32' of 8" and 31,152' of 6" PVC water main by open trench and horizontal direction drill methods to replace similar lengths of existing cast iron water distribution main; making tie-ins to existing water mains; fire hydrant replacements, customer reconnections, restoration of disturbed areas; and other miscellaneous work.