Recreation Center Worksite Package RFP
Posted
Oct 8, 2026
Dec 4, 2026
Installation of erosion and sedimentation control. Demolition of existing miscellaneous site items. Site grading as necessary for the installation of the roadway, parking areas, and building. Installation of storm sewer collection system, roof drain collectors, and associated underground stormwater management system. Installation of water line and sewer service line within 5 ft of building. Concrete sidewalks ans stairs, ADA ramp, and associated handrails. Seeding and mulching.