CityCT
Aug 28, 2026
Closes
Oct 7, 2026
Merimere Liner Replacement
Work consists of removing and disposing of the sand/sludge layer, remove and repair the underdrain system for replacement, remove and reconstruct the access ramp, remove and dispose of the filter fabric, sand below and the geomembrane and assure the gravel base is compacted and formed with no washouts or significant divots.