Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of electrical unit heaters, louvers and exhaust fans as shown in the water treatment plant building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of erosion and sediment controls and best management practices at the site and the demolition and removal of existing water treatment system including a reinforced concrete water well vault, hydro-pneumatic tank, and related appurtenances and construction of a new groundwater supply well and construction of a new precast prefabricated water treatment plant building approx. 24' x 40' including cast in place concrete building foundations. Includes construction of new water storage and water treatment system including but not limited to new sodium hypochlorite chemical feed system, greensand fiberglass pressure filter tank system, clearwell/finished water storage tanks, booster pumps, pipes, valves, fittings and appurtenances, water plant system control panel, and spare parts. Construction of various site improvements including sidewalks, chain link fencing, site utilities such as potable water distribution pipelines, and related work and erosion and sediment control work.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Construction of erosion and sediment controls and best management practices at the site and the demolition and removal of existing water treatment system including a reinforced concrete water well vault, hydro-pneumatic tank, and related appurtenances and construction of a new groundwater supply well and construction of a new precast prefabricated water treatment plant building approx. 24' x 40' including cast in place concrete building foundations. Includes construction of new water storage and water treatment system including but not limited to new sodium hypochlorite chemical feed system, greensand fiberglass pressure filter tank system, clearwell/finished water storage tanks, booster pumps, pipes, valves, fittings and appurtenances, water plant system control panel, and spare parts. Construction of various site improvements including sidewalks, chain link fencing, site utilities such as potable water distribution pipelines, and related work and erosion and sediment control work.
AvailableConstruction of under slab and interior exposed building drains, floor drains, drain/waste and vent piping in the water treatment plant building. Drainage work shall terminate 5 feet from the building foundation exterior and construction of under slab and interior exposed potable water hot and cold water plumbing and piping. Includes hot water heater, emergency eyewash unit, stainless steel utility sink, backflow preventer system and related appurtenances.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Construction of under slab and interior exposed building drains, floor drains, drain/waste and vent piping in the water treatment plant building. Drainage work shall terminate 5 feet from the building foundation exterior and construction of under slab and interior exposed potable water hot and cold water plumbing and piping. Includes hot water heater, emergency eyewash unit, stainless steel utility sink, backflow preventer system and related appurtenances.
AvailableAdjustment of existing electrical facilities as needed to accommodate new electrical facilities as shown in the existing rest area building. Construct new electrical system facilities at the water treatment plant building and to the new water well pump. Construct new site electrical power distribution system between the existing rest area building and new water treatment building as shown. Includes new metering facilities, new diesel engine driven generator and automatic transfer switch and related electrical equipment and coordination with electric utility company.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Adjustment of existing electrical facilities as needed to accommodate new electrical facilities as shown in the existing rest area building. Construct new electrical system facilities at the water treatment plant building and to the new water well pump. Construct new site electrical power distribution system between the existing rest area building and new water treatment building as shown. Includes new metering facilities, new diesel engine driven generator and automatic transfer switch and related electrical equipment and coordination with electric utility company.
AvailableProvide and install all power distribution and lighting for the salt storage building.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Provide and install all power distribution and lighting for the salt storage building.