Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide and install all power distribution and lighting for the salt storage building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Properly demolish an existing salt storage building and to construct a new 90'x60' winter material storage building.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Properly demolish an existing salt storage building and to construct a new 90'x60' winter material storage building.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include construct a sand and salt storage building approximately 20'x40' 2-sand and salt storage area 14'x20' with 8' concrete walls and sliding access door 3-center open storage area 14'x20 with 8' chain link lockable gates 4-closed storage area 12'x20' w/ 8'x10' garage door and 36" side entry door, heavy duty shelves.
Posted Date
Jan 8, 2026
Due Date
Feb 4, 2026
Release: Jan 8, 2026
Close: Feb 4, 2026
Work include construct a sand and salt storage building approximately 20'x40' 2-sand and salt storage area 14'x20' with 8' concrete walls and sliding access door 3-center open storage area 14'x20 with 8' chain link lockable gates 4-closed storage area 12'x20' w/ 8'x10' garage door and 36" side entry door, heavy duty shelves.
AvailableConstruction of erosion and sediment controls and best management practices at the site and the demolition and removal of existing water treatment system including a reinforced concrete water well vault, hydro-pneumatic tank, and related appurtenances and construction of a new groundwater supply well and construction of a new precast prefabricated water treatment plant building approx. 24' x 40' including cast in place concrete building foundations. Includes construction of new water storage and water treatment system including but not limited to new sodium hypochlorite chemical feed system, greensand fiberglass pressure filter tank system, clearwell/finished water storage tanks, booster pumps, pipes, valves, fittings and appurtenances, water plant system control panel, and spare parts. Construction of various site improvements including sidewalks, chain link fencing, site utilities such as potable water distribution pipelines, and related work and erosion and sediment control work.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Construction of erosion and sediment controls and best management practices at the site and the demolition and removal of existing water treatment system including a reinforced concrete water well vault, hydro-pneumatic tank, and related appurtenances and construction of a new groundwater supply well and construction of a new precast prefabricated water treatment plant building approx. 24' x 40' including cast in place concrete building foundations. Includes construction of new water storage and water treatment system including but not limited to new sodium hypochlorite chemical feed system, greensand fiberglass pressure filter tank system, clearwell/finished water storage tanks, booster pumps, pipes, valves, fittings and appurtenances, water plant system control panel, and spare parts. Construction of various site improvements including sidewalks, chain link fencing, site utilities such as potable water distribution pipelines, and related work and erosion and sediment control work.
AvailableThe scope of work includes the complete demolition of the existing salt storage building and construction of a new storage facility, and all necessary appurtenances and restoration for said construction. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General, HVAC, and Electrical Construction.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
The scope of work includes the complete demolition of the existing salt storage building and construction of a new storage facility, and all necessary appurtenances and restoration for said construction. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General, HVAC, and Electrical Construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →