Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes, but is not limited to, pavement markings to be removed shall be marked by the contractor or subcontractor no less than 48 hours prior to removal; saw cutting, removing, and disposing of existing deteriorated bridge deck and approach slab concrete. Removal operations shall be conducted so that the traveling public is protected, and so that interference with the traveling public using the structure is minimized; removal of portions of present structure (class 2 and 3): pneumatic hammers and chipping tools shall not be operated at an angle exceeding 60 degrees relative to the surface of the slab; etc, see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Multimodal improvements. Project includes 660 LF of storm drain inlet protection (type i); 10 ea potholing; 114 ton hot mix asphalt (patching) (asphalt); 21 SY of Concrete pavement (8"); Traffic signal face. See outside link.
Posted Date
Jan 5, 2026
Due Date
Jan 26, 2026
Release: Jan 5, 2026
Close: Jan 26, 2026
Multimodal improvements. Project includes 660 LF of storm drain inlet protection (type i); 10 ea potholing; 114 ton hot mix asphalt (patching) (asphalt); 21 SY of Concrete pavement (8"); Traffic signal face. See outside link.
AvailableThis RFP is for Barwick Street Improvements.
Posted Date
Jan 7, 2026
Due Date
Jan 15, 2026
Release: Jan 7, 2026
Close: Jan 15, 2026
This RFP is for Barwick Street Improvements.
AvailableThis RFP is for Barwick Street Improvements.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
This RFP is for Barwick Street Improvements.
AvailableProcurement of services for full depth reclamation of street pavement, installation of new bituminous pavement, concrete curb and gutter, and storm sewer maintenance for the 2026 Street Improvements project.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Procurement of services for full depth reclamation of street pavement, installation of new bituminous pavement, concrete curb and gutter, and storm sewer maintenance for the 2026 Street Improvements project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis