Retrieving RFP details
Release
Close
Boston Planning & Development Agency
Work includes the renovation of a currently empty office with twenty-eight (28) new offices, utilizing a mix of new and existing elements of the suite.
ADV for BPDA 12 Channel Street Suite 605 Office Build Out
Kansas Department of Administration
Contractor will construct a Pilot Channel on the west and south sides of Sheridan State Fishing Lake. The profile, shape, and length to match contract drawings and documents. The sediment taken out of the lake will be placed in a pit dug by the contractor. The pit location is on site.
City of Loveland
Qualified proposers to assist the City to build out its Microsoft 365 suite, including Teams, SharePoint, and OneDrive, as well as other Microsoft 365 applications as proposed (collectively “Microsoft 365” or "365").
Starbucks Corporation
Work includes approx 2,550 SF tenant build out in a newly constructed building. See outside link.
Burlington Coat Factory
This project calls for the tenant build-out of an existing 20,549 SF retail store. See outside link.
Release
Oct 08, 2024
Close
Oct 24, 2024