Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 1,049 LF of 8" C900 18 PVC water main; 2,995 LF of 10" C900 18 PVC water main; 1,258 LF of Concrete Gurb and Gutter; 607 LF of 4" Pavement Marking; 60 LF of 1.25" of Water service pipe. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide NW Library HVAC Replacement Project .
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Provide NW Library HVAC Replacement Project .
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes Installation of an 8" HDPE watermain connecting existing watermains installation of approx. 1400 LF of 8" dia. HDPE watermain using open cut and directional drilling methods; installation of hydrants, services, and other appurtenances associated with installation of the watermain; restoration of disturbed surfaces, including concrete sidewalk and driveway patching, asphalt patching, and placement of topsoil and seed; and associated erosion control and traffic control.
Posted Date
Dec 31, 2025
Due Date
Jan 20, 2026
Release: Dec 31, 2025
Close: Jan 20, 2026
Project includes Installation of an 8" HDPE watermain connecting existing watermains installation of approx. 1400 LF of 8" dia. HDPE watermain using open cut and directional drilling methods; installation of hydrants, services, and other appurtenances associated with installation of the watermain; restoration of disturbed surfaces, including concrete sidewalk and driveway patching, asphalt patching, and placement of topsoil and seed; and associated erosion control and traffic control.
AvailableThe City of Okanogan seeks a consulting firm for civil engineering design, including preliminary engineering, environmental documentation, permitting, and right-of-way planning, for the Second Avenue (SR 215) Sidewalk Replacement Project.
Posted Date
Dec 24, 2025
Due Date
Jan 22, 2026
Release: Dec 24, 2025
Close: Jan 22, 2026
The City of Okanogan seeks a consulting firm for civil engineering design, including preliminary engineering, environmental documentation, permitting, and right-of-way planning, for the Second Avenue (SR 215) Sidewalk Replacement Project.
AvailableThe scope of work includes but is not limited to; removal & replacement of the existing avenue bridge over creek; construct new cast-in-place concrete bridge, replace existing sewer siphon, perform drainage improvements, new pavement, curb, gutter and sidewalk construction, retaining walls and installation of signing and striping.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
The scope of work includes but is not limited to; removal & replacement of the existing avenue bridge over creek; construct new cast-in-place concrete bridge, replace existing sewer siphon, perform drainage improvements, new pavement, curb, gutter and sidewalk construction, retaining walls and installation of signing and striping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →