Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Chico is soliciting bids to remove and replace the Pomona Avenue Bridge over Little Chico Creek, including construction of a new cast-in-place concrete bridge, replacement of an existing sewer siphon, drainage improvements, pavement, curb/gutter/sidewalk, retaining walls, and signing/striping. The Engineer's Estimate is approximately $4.8 million and the project is funded with Federal Highway Bridge Program funds. A virtual non-mandatory pre-bid outreach meeting is scheduled for 2025-12-17; bids are required to include a bid security equal to at least 10% of the total bid.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
Posted Date
Oct 23, 2023
Due Date
Jul 1, 2026
Release: Oct 23, 2023
Close: Jul 1, 2026
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
AvailablePremium
Access the largest public sector contact database
Bridge replacement project which includes the removal of the existing two span steel i-beam bridge structure and replacement with a new single span pre-stressed concrete box girder bridge.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Bridge replacement project which includes the removal of the existing two span steel i-beam bridge structure and replacement with a new single span pre-stressed concrete box girder bridge.
AvailableRequest for proposals for the Bridge Replacement Project for Poga 1 (Bridge ID No. 10S25200001) and Poga 2 (Bridge ID No. 10S25200003) over Elk River in Elizabethton, TN.
Posted Date
Dec 5, 2025
Due Date
Jan 15, 2026
Release: Dec 5, 2025
Close: Jan 15, 2026
Request for proposals for the Bridge Replacement Project for Poga 1 (Bridge ID No. 10S25200001) and Poga 2 (Bridge ID No. 10S25200003) over Elk River in Elizabethton, TN.
AvailableCity of Gallatin seeks engineering consulting firms for design and final construction plans for replacement of Bridge 833328 on South Westland Avenue over CSX rail lines. Scope includes site and structural design, demolition, new bridge construction, approach realignment, drainage improvements, utility relocation, surveying, ROW and easement acquisition, railroad coordination, environmental investigations, public involvement, and preparation of bid/construction documents. Prime and all subconsultants must be on TDOT's pre-approved list and the prime must have unlimited status. Submittal requires a Letter of Interest and a Statement of Qualifications (max 15 sheets/30 electronic pages), two bound copies plus a PDF on external storage; deliver to Jake Wilson, Assistant City Engineer.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
City of Gallatin seeks engineering consulting firms for design and final construction plans for replacement of Bridge 833328 on South Westland Avenue over CSX rail lines. Scope includes site and structural design, demolition, new bridge construction, approach realignment, drainage improvements, utility relocation, surveying, ROW and easement acquisition, railroad coordination, environmental investigations, public involvement, and preparation of bid/construction documents. Prime and all subconsultants must be on TDOT's pre-approved list and the prime must have unlimited status. Submittal requires a Letter of Interest and a Statement of Qualifications (max 15 sheets/30 electronic pages), two bound copies plus a PDF on external storage; deliver to Jake Wilson, Assistant City Engineer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis