Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for proposals for the Bridge Replacement Project for Poga 1 (Bridge ID No. 10S25200001) and Poga 2 (Bridge ID No. 10S25200003) over Elk River in Elizabethton, TN.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge replacement project. 963 SY - removal of asphalt pavement; 2,374 CY - road and drainage excavation (unclassified); 8 unit - water (seeding & sodding); 4,669 CY - embankment (compacted in place); 669 ton - mineral aggregate, type A base; 2 ton - bituminous material for prime coat (PC); 7 ton - aggregate for cover material (PC); 3,694 ton - machined rip rap (class A-3).
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
Bridge replacement project. 963 SY - removal of asphalt pavement; 2,374 CY - road and drainage excavation (unclassified); 8 unit - water (seeding & sodding); 4,669 CY - embankment (compacted in place); 669 ton - mineral aggregate, type A base; 2 ton - bituminous material for prime coat (PC); 7 ton - aggregate for cover material (PC); 3,694 ton - machined rip rap (class A-3).
Premium
Access the largest public sector contact database
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
Posted Date
Oct 23, 2023
Due Date
Jul 1, 2026
Release: Oct 23, 2023
Close: Jul 1, 2026
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
AvailableBridge replacement project which includes the removal of the existing two span steel i-beam bridge structure and replacement with a new single span pre-stressed concrete box girder bridge.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Bridge replacement project which includes the removal of the existing two span steel i-beam bridge structure and replacement with a new single span pre-stressed concrete box girder bridge.
AvailableProvide surveying services for the ellis road bridge replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Provide surveying services for the ellis road bridge replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis