West Linda Multi-Use Basin Phase II Project RFP
Posted
Oct 28, 2026
Nov 18, 2026
Work includes 10,000 SF erosion control - hydroseed, 407 CY (f) roadway excavation (cut), 1,891 ton class ii 3/4" aggregate base, 342 LF concrete curb (type a1-6), 96 LF 12" diameter hdpe pipe, 20 lf remove (ex)12" diameter storm drain stubout pipe, 1 EA connect to existing storm drain, 3,843 SF concrete flatwork (6" thickness) (reinforced), 270 sf concrete sidewalk (4" thickness), 5 ton temporary hma ramp, 1 EA ada parking sign on single post r99c (ca). See attached file.