Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes recycled asph conc patching, incl bitum matl and h lime 500.000 TN, recycled asph conc 12.5 mm superpave, gp 2 only, incl bitum matl & h lime 18,067.000 TN, recycled asph conc 19 mm superpave, gp 1 or 2,incl bitum matl & h lime 6,900.000 TN, asphalt-rubber joint and crack seal, tp s 303,500.000 LF, tack coat 12,597.000 GL, mill asph conc pvmt, variable depth 195,451.000 SY, patching pcc pavement 500.000 SY, full depth slab replacement 2,050.000 CY, freeway-shoulder rumble strips, ground in place (continuous), 16" (400 mm) 24.000 GLM. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes traffic control, temporary grassing 4.716 AC, grading per mile 9.432 LM, miscellaneous construction, unpaved roads, streets and driveways 103.000 EA, recycled asph conc patching, incl bitum matl & h lime 2,222.000 TN, recycled asph conc leveling, incl bitum matl & h lime 5,855.000 TN, recycled asph conc 12.5 mm superpave, gp 2 only, incl bitum matl & h lime 14,862.000 TN, tack coat 12,610.000 gl, bituminous scrub seal type c 180,142.000 SY, mill asph conc pvmt, variable depth 7,245.000 SY, sinusoidal centerline rumble strips-ground in place (continuous), double row 6in (150 mm). See attached file.
Posted Date
Jan 28, 2026
Due Date
Feb 20, 2026
Release: Jan 28, 2026
Close: Feb 20, 2026
Work includes traffic control, temporary grassing 4.716 AC, grading per mile 9.432 LM, miscellaneous construction, unpaved roads, streets and driveways 103.000 EA, recycled asph conc patching, incl bitum matl & h lime 2,222.000 TN, recycled asph conc leveling, incl bitum matl & h lime 5,855.000 TN, recycled asph conc 12.5 mm superpave, gp 2 only, incl bitum matl & h lime 14,862.000 TN, tack coat 12,610.000 gl, bituminous scrub seal type c 180,142.000 SY, mill asph conc pvmt, variable depth 7,245.000 SY, sinusoidal centerline rumble strips-ground in place (continuous), double row 6in (150 mm). See attached file.
AvailableThe Georgia Department of Transportation (GDOT) is soliciting pavement preservation and maintenance services for the SR 85 @ I-285 ramp under solicitation #48400DOT0003463. The opportunity focuses on localized pavement maintenance near the SR 85 and I-285 interchange and is restricted to pre-qualified contractors with specific Master Services Agreements. Bids are due by February 4, 2026, at 10:00 PM ET.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
The Georgia Department of Transportation (GDOT) is soliciting pavement preservation and maintenance services for the SR 85 @ I-285 ramp under solicitation #48400DOT0003463. The opportunity focuses on localized pavement maintenance near the SR 85 and I-285 interchange and is restricted to pre-qualified contractors with specific Master Services Agreements. Bids are due by February 4, 2026, at 10:00 PM ET.
The Georgia Department of Transportation issued a solicitation for pavement preservation and maintenance services on the SR-85 at I-285 ramp. Participation is limited to pre-qualified contractors holding a specific Master Services Agreement identification number. The procurement process follows standard state guidelines, with bids due in early February 2026.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
The Georgia Department of Transportation issued a solicitation for pavement preservation and maintenance services on the SR-85 at I-285 ramp. Participation is limited to pre-qualified contractors holding a specific Master Services Agreement identification number. The procurement process follows standard state guidelines, with bids due in early February 2026.
Work includes approx. 8,249 TN 12.5 MM asphalt concrete, 11,548 GL tack coat, 154,727 SY micro-mill asphaltic concrete pavement, 10,100 LF 12" white thermoplastic solid traffic stripe.
Posted Date
Jan 28, 2026
Due Date
Feb 20, 2026
Release: Jan 28, 2026
Close: Feb 20, 2026
Work includes approx. 8,249 TN 12.5 MM asphalt concrete, 11,548 GL tack coat, 154,727 SY micro-mill asphaltic concrete pavement, 10,100 LF 12" white thermoplastic solid traffic stripe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis