Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Improvements along the state routes. Work includes clearing and grubbing; 5,443 CY of CL 1 excavation; 634 CY of Cl 1A excavation; 3,146 LF of saw cutting; 64,036 SY of milling of asphalt pavement surface; 38 SY of 4" depth plain cement concrete pavement; 8 LS of 12" thermoplastic pipe; 849 LF of cleaning existing pipe culverts; 12 LF of 12" RC pipe; 1,318 LF of 18" RCP pipe; 71 Ea cleaning drainage structures; 3,693 LF of 4" pavement base drain; 613 LF of type 31-S guide rail; 61 SY of cement concrete sidewalk; 1,288 SY of cement concrete sidewalk for ADA ramps; pavement markings; landscaping. See outside link for complete scope of work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for the replacement of existing low-level bridges and construction of new bridges on SR 5 (US 1) over Pellicer Creek, including flexible pavement reconstruction, milling and resurfacing, base work, shoulder gutter, guardrail, soil stabilization, and signing/pavement markings.
Posted Date
Jan 28, 2026
Due Date
Jan 28, 2026
Release: Jan 28, 2026
Close: Jan 28, 2026
This RFP is for the replacement of existing low-level bridges and construction of new bridges on SR 5 (US 1) over Pellicer Creek, including flexible pavement reconstruction, milling and resurfacing, base work, shoulder gutter, guardrail, soil stabilization, and signing/pavement markings.
AvailableProvide professional engineering consultant to provide cei services for construction of free-flow interchange, 1.4 miles of us 27 reconstruction, eight (8) new bridges, drainage, lighting, its, signing and pavement markings, and in-road electric vehicle charging pilot.
Posted Date
Jul 2, 2025
Due Date
Jan 28, 2026
Release: Jul 2, 2025
Close: Jan 28, 2026
Provide professional engineering consultant to provide cei services for construction of free-flow interchange, 1.4 miles of us 27 reconstruction, eight (8) new bridges, drainage, lighting, its, signing and pavement markings, and in-road electric vehicle charging pilot.
Improve us-31w from campbell lane
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
Improve us-31w from campbell lane
AvailableMilling & resurfacing, base work, shoulder treatment, drainage improvements, curb & gutters, traffic signals, lighting, highway signing, guardrail, sidewalks/bicycle path, and other incidental construction.
Posted Date
Dec 1, 2025
Due Date
Jan 28, 2026
Release: Dec 1, 2025
Close: Jan 28, 2026
Milling & resurfacing, base work, shoulder treatment, drainage improvements, curb & gutters, traffic signals, lighting, highway signing, guardrail, sidewalks/bicycle path, and other incidental construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis