Texas Department of Transportation
Work includes 3,601 SY of removing conc (riprap); 706 SY of removing conc (driveways); 616 LF of removing conc (curb); 36,836 SY of removing stab base & asph pav(16"); 1,508 SY of removing stab base and asph pav(8"); 1,689 SY of removing stab base & asph pav (0-6"); 7,765 CY of excavation (roadway); 45,115 CY of embankment (final)(dens cont)(ty c); 82,252 SY of furnishing and placing topsoil (4"); 8,234 SY of block sodding; etc, see outside link.
Release
Sep 27, 2024
Close
Nov 07, 2024