Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 500' storm sewers to be cleaned 12"; 11,606' shoulder rumble strips, 8"; 2,228 SY class D patches, type II, 10"; 1,599 SY class d patches, type III, 10; 5 EA. Frames and grates, type 24; 7,637 ton polymerized hot-mix asphalt surface course, IL-9.5, mix "E", n70; 4,286 ton polymerized hot-mix asphalt binder course, IL-4. 75, N50; 178 ton mixture for cracks, joints, and flangeways; 24,560' longitudinal joint sealant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of: pavement removal, 500 SY; remove sidewalk concrete, 60 SY; common excavation, 35 CY; compacted aggregate, no. 53, 100 TN; compacted aggregate, no. 73, 70 TN; HMA patching, full depth, Type C, 300 TN; HMA patching, partial depth, Type C, 300 TN; HMA patching, partial depth, Type D, 250 TN; asphalt milling, 1 1/2-IN, 5000 SY; milling, asphalt, 2-IN, 5000 SY; HMA wedge and level, Type C, 250 TN; HMA wedge and level, Type D, 250 TN; asphalt for tack coat, 6 TN; PCCP patching, full depth, 425 SY; sidewalk, concrete 5SY; curb ramp, concrete, 50 SY; temporary pavement marking, removable, 4-IN, 2500 LF; line, paint, broken, yellow, 6-IN, 2600 LF; 4-IN, 2500 LF; line, paint, broken, white, 6-IN, 5280LF.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: pavement removal, 500 SY; remove sidewalk concrete, 60 SY; common excavation, 35 CY; compacted aggregate, no. 53, 100 TN; compacted aggregate, no. 73, 70 TN; HMA patching, full depth, Type C, 300 TN; HMA patching, partial depth, Type C, 300 TN; HMA patching, partial depth, Type D, 250 TN; asphalt milling, 1 1/2-IN, 5000 SY; milling, asphalt, 2-IN, 5000 SY; HMA wedge and level, Type C, 250 TN; HMA wedge and level, Type D, 250 TN; asphalt for tack coat, 6 TN; PCCP patching, full depth, 425 SY; sidewalk, concrete 5SY; curb ramp, concrete, 50 SY; temporary pavement marking, removable, 4-IN, 2500 LF; line, paint, broken, yellow, 6-IN, 2600 LF; 4-IN, 2500 LF; line, paint, broken, white, 6-IN, 5280LF.
AvailableMilling, HMA Overlay, Shoulders, and Patching.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Milling, HMA Overlay, Shoulders, and Patching.
AvailableApprox. 4,489 SY of partial depth pavement patching, 4,830 SY of full depth pavement patching, 21,500 SY of diamond grinding, 298 STA of painted pavement markings, 375 SY of PCC Median Edge and miscellaneous related work and appurtenances.
Posted Date
Jan 14, 2026
Due Date
Feb 10, 2026
Release: Jan 14, 2026
Close: Feb 10, 2026
Approx. 4,489 SY of partial depth pavement patching, 4,830 SY of full depth pavement patching, 21,500 SY of diamond grinding, 298 STA of painted pavement markings, 375 SY of PCC Median Edge and miscellaneous related work and appurtenances.
AvailableConstruct HMA overlays on various residential streets. Project items include full depth patching, milling, HMA overlay, intake reconstruction, curb and gutter replacement, sidewalk replacement, fixture adjustments, traffic control and restoration.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Construct HMA overlays on various residential streets. Project items include full depth patching, milling, HMA overlay, intake reconstruction, curb and gutter replacement, sidewalk replacement, fixture adjustments, traffic control and restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis