Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct HMA overlays on various residential streets. Project items include full depth patching, milling, HMA overlay, intake reconstruction, curb and gutter replacement, sidewalk replacement, fixture adjustments, traffic control and restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project includes all materials, equipment, transportation and labor needed to construct full depth PCC patches on various residential streets. Project items include full-depth patching, sidewalk removal and replacement, intake reconstruction, fixture adjustments, traffic control, mobilization and restoration.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
This project includes all materials, equipment, transportation and labor needed to construct full depth PCC patches on various residential streets. Project items include full-depth patching, sidewalk removal and replacement, intake reconstruction, fixture adjustments, traffic control, mobilization and restoration.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of King (King City), CA is soliciting bids for the 2025 CDBG Pavement Rehabilitation Project to perform pavement rehabilitation on several street segments, including digouts, adjustment of utility covers, cold planing, HMA leveling and surface courses, cape seal, striping, and markings. The project is funded by a Community Development Block Grant (CDBG) and must comply with applicable federal and state provisions, including prevailing wage and bonding requirements; contract time is 40 working days from notice to proceed. Bids were posted with an open date of 2025-12-22 and a close date of 2026-02-05 (the posting was last updated 2025-12-24), and contact for the bid is Octavio Hurtado (ohurtado@kingcity.com, 831-385-3281 ext 5927).
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
The City of King (King City), CA is soliciting bids for the 2025 CDBG Pavement Rehabilitation Project to perform pavement rehabilitation on several street segments, including digouts, adjustment of utility covers, cold planing, HMA leveling and surface courses, cape seal, striping, and markings. The project is funded by a Community Development Block Grant (CDBG) and must comply with applicable federal and state provisions, including prevailing wage and bonding requirements; contract time is 40 working days from notice to proceed. Bids were posted with an open date of 2025-12-22 and a close date of 2026-02-05 (the posting was last updated 2025-12-24), and contact for the bid is Octavio Hurtado (ohurtado@kingcity.com, 831-385-3281 ext 5927).
AvailableEl Dorado County Department of Transportation is soliciting bids for the "2026 DOT SLT Maintenance Pavement Rehabilitation Projects," a multi-location pavement rehabilitation program in the South Lake Tahoe area that includes removal/replacement of hot-mix asphalt, raising/lowering iron, and placement of grindable geosynthetic pavement reinforcing fabric. The Board authorized advertisement as Contract No. 9966 in early January 2026 and a CEQA Notice of Exemption for the project was filed on 2025-12-17; the County is using QuestCDN as the official posting/planroom for contract documents and electronic bid submission. The published response deadline on the posting is 2026-02-04 and interested bidders must access the QuestCDN posting (Quest/project access or password required) or contact the County DOT (South Lake Tahoe project contacts) for questions.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
Close: Feb 4, 2026
El Dorado County Department of Transportation is soliciting bids for the "2026 DOT SLT Maintenance Pavement Rehabilitation Projects," a multi-location pavement rehabilitation program in the South Lake Tahoe area that includes removal/replacement of hot-mix asphalt, raising/lowering iron, and placement of grindable geosynthetic pavement reinforcing fabric. The Board authorized advertisement as Contract No. 9966 in early January 2026 and a CEQA Notice of Exemption for the project was filed on 2025-12-17; the County is using QuestCDN as the official posting/planroom for contract documents and electronic bid submission. The published response deadline on the posting is 2026-02-04 and interested bidders must access the QuestCDN posting (Quest/project access or password required) or contact the County DOT (South Lake Tahoe project contacts) for questions.
AvailablePavement milling, hot-mix asphalt (HMA) binder and surface course installation, HMA patching, manhole structure repair, replacement, and adjustments, sewer repairs, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, aggregate shoulder installation, parkway restoration, thermoplastic pavement markings, and all incidental and collateral work necessary to complete the project.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Pavement milling, hot-mix asphalt (HMA) binder and surface course installation, HMA patching, manhole structure repair, replacement, and adjustments, sewer repairs, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, aggregate shoulder installation, parkway restoration, thermoplastic pavement markings, and all incidental and collateral work necessary to complete the project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →