Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 596 SY removing concrete pavement; 19,960 SY removing asphaltic surface; 5,310 LF removing curb & gutter; 2,656 SY removing concrete sidewalk; 120 LF removing storm sewer (size) 01. 12" through 18"; 1,603 CY breaker run; 5,310 LF concrete curb & gutter 30" type d; 22,840 SF concrete sidewalk 5"; 4,221 SF concrete sidewalk 7"; 180 SF curb ramp detectable warning field natural patina; 886 SY concrete driveway 7"; 1,943 LF storm sewer pipe reinforced concrete class v 15"; 4,416 LF pipe underdrain unperforated 8"; 4,790 SY mulching; 790 LF marking crosswalk paint transverse line 6".
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This solicitation requests design and engineering services for the N Main Street Corridor Improvement project in Rhode Island. The buyer published the solicitation on 2025-12-02 with a bid closing date of 2026-01-12 at 02:00 PM EST. Bid documents and detailed solicitation text are hosted on the buyer-managed BidNet Direct posting and require vendor registration to access.
Posted Date
Dec 2, 2025
Due Date
Jan 12, 2026
Release: Dec 2, 2025
Close: Jan 12, 2026
This solicitation requests design and engineering services for the N Main Street Corridor Improvement project in Rhode Island. The buyer published the solicitation on 2025-12-02 with a bid closing date of 2026-01-12 at 02:00 PM EST. Bid documents and detailed solicitation text are hosted on the buyer-managed BidNet Direct posting and require vendor registration to access.
AvailableCR 214 (King Street) and N Volusia Street Intersection Improvements
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
CR 214 (King Street) and N Volusia Street Intersection Improvements
AvailableDesign and engineering services for the redesign of the North Main Street (US Route 1) corridor, including conceptual design, advanced engineering, NEPA approvals, permitting, and final engineering.
Posted Date
-
Due Date
Jan 12, 2026
Close: Jan 12, 2026
Design and engineering services for the redesign of the North Main Street (US Route 1) corridor, including conceptual design, advanced engineering, NEPA approvals, permitting, and final engineering.
AvailableConstruction of E. Elm Street Transmission Main Improvements, including installation of 1,250 LF of 16-inch and 70 LF of 8-inch C900 PVC water main, valves, fire hydrant assemblies, and E. Elm Street reconstruction involving HMA, crushed surfacing, and excavation.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Construction of E. Elm Street Transmission Main Improvements, including installation of 1,250 LF of 16-inch and 70 LF of 8-inch C900 PVC water main, valves, fire hydrant assemblies, and E. Elm Street reconstruction involving HMA, crushed surfacing, and excavation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis