Georgia Department of Transportation
State AgencyGA
Posted
Sep 18, 2026
Oct 16, 2026
0019539 - 0.180 Mile of Construction of a Bridge and Approaches RFP
Work includes approx. 25 TN mulch, 250 TN 9.5 MM recycled asphalt concrete superpave, 0.300 GLM sinusoidal shoulder rumble strips, 3 EA portable message sign, pavement marking, 100 LF guardrail, 2,000 LF 4' barrier fence, 1 AC permanent grassing, 2.2 TN agricultural lime, 2,000 SY erosion control mats, 578 CY bridge excavation, 468 LF concrete barrier, 22,059 LB bar reinforce steel, 1,910 LF 16" SQ PSC piling.
