CityCA
Posted
Sep 2, 2026
Oct 8, 2026
Ramon Road Bridge Widening Project
Work includes approx 220 CY roadway excavation; 2,720 SF 8" PCC driveway; 2,892 CY structure excavation (bridge); 1,268 CY structural concrete, bridge footing; 1,231 LF of concrete railing; 130 LF of 18" RCP storm drain.
