CityOK
Posted
Sep 1, 2026
Sep 22, 2026
16\" Water Transmission - Elm Place, Florence Street To Miami Street
Work includes constructing a 16” waterline and to replace an existing 10” waterline.
Browse RFPs from City of Broken Arrow with upcoming deadlines.
5 opportunities shown.
CityOK
Posted
Sep 1, 2026
Sep 22, 2026
Work includes constructing a 16” waterline and to replace an existing 10” waterline.
CityOK
Posted
Sep 15, 2026
Oct 6, 2026
This project includes open cut and trenchless construction of 2,816 LF of 15" PVC, 3,867 LF of 18" PVC, and 344 LF of 20" HDPE gravity sewer along State Highway 51, through the Creek 51 Business Park and south to E.
CityOK
Posted
Sep 8, 2026
Sep 29, 2026
The City of Broken Arrow is soliciting bids under RFP Number 27.109 for Storm Sewer Improvements and Erosion Repair on the Indian Springs Golf Course.
CityOK
Posted
Aug 28, 2026
Sep 22, 2026
This is an annual requirements contract for the supply and delivery of ready-mix concrete, flowable fill, additives, and related products.
CityOK
Posted
Sep 8, 2026
Sep 29, 2026
Work includes approx. of 45 LF of 48" corrugated polypropylene pipe; 1 EA of 48" prefab. culvert end section, round, concrete; 2,500 CY of unclassified borrow; 236 LF of temporary silt fence; 1,073 SY of solid slab SOD; 611 SY of erosion control mat with hydroseed.