City of Yucaipa - 2026/2027 Street Rehabilitation
Aug 6, 2026
Closes
Aug 25, 2026
Work includes approx 730,000 SF of 2" full width mill A.C pavement of entire street section; 430,000 SF of 1.5" full width grind existing A.C pavement; 86,200 SF of 8-9" max depth pulverize existing pavement. grade and compact; 86,200 SF of 3-4" remove and dispose pulverized material; 730,000 SF of 2.5" A.C pavement cap; 430,000 SF of 2" A.C pavement cap; 86,200 SF of 4" A.C pavement cap; 5,650 LF of Thermoplastic Striping – Yellow Dashed Centerline, (Caltrans A20A Detail 2 ) Complete in Place; 2,800 LF of Thermoplastic Striping – Yellow Dashed Centerline, (Caltrans A20A Detail 6) Complete in Place; 2,400 LF of Thermoplastic Striping – White Dashed Lane Line, (Caltrans A20A Detail 9) Complete in Place; 450 LF of Thermoplastic Striping – Double Yellow One Direction Permissive Passing, (Caltrans A20A Detail 16) Complete in Place; 890 LF of Thermoplastic Striping – Double Yellow Two-Direction No passing with pavement markers, (Caltrans A20A Detail 22) Complete in Place; 27,200 LF of Thermoplastic Striping – Right Edgeline (Caltrans A20B Detail 27B); 2,100 LF of Thermoplastic Striping – Double Yellow Two-Way Left-Turn Lane Pattern with Pavement Markers, (Caltrans A20B Detail 32) Complete in Place; 600 LF of Thermoplastic Striping – White Channelizing Line, (Caltrans A20D Detail 38) Complete in Place; 200 LF of Thermoplastic Striping – White Channelizing Line, (Caltrans A20D Detail 38A) Complete in Place; 2,300 LF of Thermoplastic Striping – White Bike Lane Line, (Caltrans A20D Detail 39) Complete in Place; 400 LF of Thermoplastic Striping – White Bike Lane Intersection Line, (Caltrans A20D Detail 39A) Complete in Place; 500 LF of 8" Asphalt Concrete Berm per San Bernardino County Standard Plan 117.
