Replacement of Orangeville Center Road (CR 31) Bridge over Stony Brook RFP
Posted
Nov 23, 2026
Dec 17, 2026
Work inlcudes 70 CY removal of substructures; 220 CY unclassified excavation and disposal; 1,275 CY embankment in place; 400 CY select structure fill; 2,580 CY structure excavation; 15 CY trench and culvert excavation; 155 SY prefabricated composite structural drain; 200 SY mulch - temporary; 390 LF sediment filter log - temporary, 12", type a. See attached file.



