North Outfall Rehabilitation
Aug 5, 2026
Closes
Sep 3, 2026
The Work will include all necessary labor, supervision, equipment, tools, and materials for the demolition of existing steel pipe supports, protection of the existing ductile iron pipe, installation of new concrete pipe saddles, and coating of exposed pipe, as well as rehabilitation of an existing sanitary sewer manhole. The manhole rehabilitation includes installation of a new precast concrete eccentric cone, fiber reinforced shotcrete placement, concrete surface preparation, and protection of the existing pipe penetration and boot.
