Open RFP

HWY 105 Utility Relocation – Phase B

Description: Work includes: demolition/abandonment of the existing water distribution main; demolition/abandonment of existing pressure reducing valves (PRVs); construction of a new water distribution main (using open cut construction); connections to existing water mains; reconnection of existing water service connections; removal and replacement of existing fire hydrants; demolition/abandon existing fire hydrants; installation of new fire hydrants; concrete and asphalt removal and replacement; installation of all valves; fittings; bends; tees; crosses; air/vacuum relief valves; relocation of existing sanitary sewer mains along Colorado State Highway 105 including demolition/abandonment of existing sanitary sewer mains; demolition/abandonment of existing manholes; construction of new sanitary sewer mains; construction of new manholes; connection to existing sanitary sewer mains; concrete and asphalt removal and replacement; associated site work; additive bid alternative includes installation of underground electrical and appurtenances; coordination with MVEA for inspections.

Buyer
Released
-
Closes
Oct 13, 2026(17 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts