Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Woodbury City Public Schools
Replace existing steel domestic water supply, return, and recirculation piping from the boiler room to classroom and bathroom sinks. Replacement scope includes the entire piping run from the boiler room through corridors to classroom and bathroom sinks, including branch piping to existing faucets. The proposed new pipe route is to be anticipated to run within the classrooms with new metal enclosures. No mechanical, electrical, fire protection and fire alarm scope are included in this project.
Posted Date
Mar 21, 2026
Due Date
Apr 21, 2026
Release: Mar 21, 2026
Woodbury City Public Schools
Close: Apr 21, 2026
Replace existing steel domestic water supply, return, and recirculation piping from the boiler room to classroom and bathroom sinks. Replacement scope includes the entire piping run from the boiler room through corridors to classroom and bathroom sinks, including branch piping to existing faucets. The proposed new pipe route is to be anticipated to run within the classrooms with new metal enclosures. No mechanical, electrical, fire protection and fire alarm scope are included in this project.
AvailableWoodbury City Public Schools
Roof replacement at gymnasium at junior-senior high school.
Posted Date
Nov 19, 2024
Due Date
Dec 11, 2024
Release: Nov 19, 2024
Woodbury City Public Schools
Close: Dec 11, 2024
Roof replacement at gymnasium at junior-senior high school.
Woodbury City Public Schools
Addition and renovations to elementary school. Includes construction of a new addition to contain the following: Eight Pre-K classrooms, small group rooms, multi-purpose room/stage/gym, offices, toilet rooms and storage (work area 21,660 SF). Renovate existing cafeteria to provide additional space for dining. Remove existing stage to provide needed floor area (work area 3,120 SF).
Posted Date
Sep 4, 2024
Due Date
Oct 8, 2024
Release: Sep 4, 2024
Woodbury City Public Schools
Close: Oct 8, 2024
Addition and renovations to elementary school. Includes construction of a new addition to contain the following: Eight Pre-K classrooms, small group rooms, multi-purpose room/stage/gym, offices, toilet rooms and storage (work area 21,660 SF). Renovate existing cafeteria to provide additional space for dining. Remove existing stage to provide needed floor area (work area 3,120 SF).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Woodbury City Public Schools
The Woodbury City Public Schools Strategic Plan (2022-2027) focuses on five key areas: creating multiple pathways to success by offering diverse career and technical education (CTE) options; improving academic outcomes by focusing on key transition grades (K, 5, and 9) and implementing a multi-tiered system of support (MTSS); supporting English language learners (ELLs) by establishing a PreK-12 multilingual department and providing comprehensive support services; building a connected learning community by fostering inclusivity, communication, and celebration; and ensuring access, equity, and understanding for all students by addressing systemic inequities and providing targeted support to underserved populations. The plan aims to achieve measurable goals by 2027, including providing multiple career pathways for 100% of students, ensuring all students meet annual growth targets in math and reading, providing support and services to all ELL students, achieving a 90% inclusion rating in the annual district survey, and ensuring 100% of underserved populations receive necessary support for academic, social, and emotional success.
The Woodbury City Public Schools Strategic Plan (2022-2027) focuses on five key areas: Career and Technical Education (providing multiple career pathways for all students by 2027); Improved Academic Outcomes (all students meeting annual growth goals in math and reading by 2027); Supporting English Language Learners (ensuring all ELL students have access to support and services to improve academic performance by 2027); Connected Learning Community (90% of staff, students, and parents feeling included in the school community by 2027); and Access, Equity, and Understanding for All (100% of systemically underserved populations receiving necessary support to succeed academically, socially, and emotionally). The plan emphasizes creating a supportive and equitable learning environment, building strong community partnerships, and providing diverse learning opportunities to meet the needs of all students. Specific benchmarks and strategies are outlined for each goal, with a focus on measurable progress and continuous improvement.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Woodbury City Public Schools's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database