Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Wise County Public Service Authority
Building repair and maintenance services.
Posted Date
May 18, 2026
Due Date
Jun 23, 2026
Release: May 18, 2026
Wise County Public Service Authority
Close: Jun 23, 2026
Building repair and maintenance services.
AvailableWise County Public Service Authority
Construction of approx. 1,500 LF of 16" water main. Hoadly Booster Pumping Station (F05) and Discharge Main Upgrades. The work includes, but is not limited to the following: Mobilization: All work related to the preparations onsite prior to the commencement of any work; Demobilization and Closeout – All work related to demobilization of project site and closeout as required by the Contract Documents; Performance of all work as described in the Contract Documents for upgrades to the existing Hoadly Booster Pump Station (F05) and Discharge Main; Site preparation, to include erosion and sediment controls, tree pruning as necessary; Furnishing, installing a new Industrialized Building to house the new Hoadly Booster Pumping Station; Furnishing, installing, testing, and start-up of the new prefabricated Hoadly Booster Pumping Station; Installation of reinforced concrete generator and new Hoadly Booster Pumping Station pads; Installation of approx. 100 LF of 12" ductile iron watermain; Abandonment of the existing Hoadly Booster Station once the new Hoadly Booster Station has been completed, to include coordination with Power Utility (Dominion Energy) to remove power from the existing building. Abandoned items such as pump control building, tank, vault, valves, pole, flow meter, fire hydrant, light pole, etc. shall be removed and disposed off site. PW Water shall have right to salvage any abandoned items; Coordinate with Power Utility (Dominion Energy) for electrical service to the new Hoadly Booster Pumping Station, to include conduit and meter base installation; Site improvements, permanent restoration to include paving and seeding, and fence as shown on the Contract Documents; Miscellaneous work as shown on the Drawings and as specified.
Posted Date
Jul 21, 2016
Due Date
Jul 16, 2026
Release: Jul 21, 2016
Wise County Public Service Authority
Close: Jul 16, 2026
Construction of approx. 1,500 LF of 16" water main. Hoadly Booster Pumping Station (F05) and Discharge Main Upgrades. The work includes, but is not limited to the following: Mobilization: All work related to the preparations onsite prior to the commencement of any work; Demobilization and Closeout – All work related to demobilization of project site and closeout as required by the Contract Documents; Performance of all work as described in the Contract Documents for upgrades to the existing Hoadly Booster Pump Station (F05) and Discharge Main; Site preparation, to include erosion and sediment controls, tree pruning as necessary; Furnishing, installing a new Industrialized Building to house the new Hoadly Booster Pumping Station; Furnishing, installing, testing, and start-up of the new prefabricated Hoadly Booster Pumping Station; Installation of reinforced concrete generator and new Hoadly Booster Pumping Station pads; Installation of approx. 100 LF of 12" ductile iron watermain; Abandonment of the existing Hoadly Booster Station once the new Hoadly Booster Station has been completed, to include coordination with Power Utility (Dominion Energy) to remove power from the existing building. Abandoned items such as pump control building, tank, vault, valves, pole, flow meter, fire hydrant, light pole, etc. shall be removed and disposed off site. PW Water shall have right to salvage any abandoned items; Coordinate with Power Utility (Dominion Energy) for electrical service to the new Hoadly Booster Pumping Station, to include conduit and meter base installation; Site improvements, permanent restoration to include paving and seeding, and fence as shown on the Contract Documents; Miscellaneous work as shown on the Drawings and as specified.
AvailableWise County Public Service Authority
Construction of a 1,000 GPD septic system with TL-3 pretreatment, effluent pump station and 1,100 LF of 2" force main, a drip-irrigation effluent disposal system, and associated appurtenances.
Posted Date
May 8, 2026
Due Date
Jun 4, 2026
Release: May 8, 2026
Wise County Public Service Authority
Close: Jun 4, 2026
Construction of a 1,000 GPD septic system with TL-3 pretreatment, effluent pump station and 1,100 LF of 2" force main, a drip-irrigation effluent disposal system, and associated appurtenances.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Wise County Public Service Authority
The document includes records referencing signed January 2026 Board Minutes and a January 26 Closed Session Certificate. Key discussion topics are not detailed in the provided text snippets.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Wise County Public Service Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge