Summary
Construction of approx. 1,500 LF of 16" water main. Hoadly Booster Pumping Station (F05) and Discharge Main Upgrades. The work includes, but is not limited to the following: Mobilization: All work related to the preparations onsite prior to the commencement of any work; Demobilization and Closeout – All work related to demobilization of project site and closeout as required by the Contract Documents; Performance of all work as described in the Contract Documents for upgrades to the existing Hoadly Booster Pump Station (F05) and Discharge Main; Site preparation, to include erosion and sediment controls, tree pruning as necessary; Furnishing, installing a new Industrialized Building to house the new Hoadly Booster Pumping Station; Furnishing, installing, testing, and start-up of the new prefabricated Hoadly Booster Pumping Station; Installation of reinforced concrete generator and new Hoadly Booster Pumping Station pads; Installation of approx. 100 LF of 12" ductile iron watermain; Abandonment of the existing Hoadly Booster Station once the new Hoadly Booster Station has been completed, to include coordination with Power Utility (Dominion Energy) to remove power from the existing building. Abandoned items such as pump control building, tank, vault, valves, pole, flow meter, fire hydrant, light pole, etc. shall be removed and disposed off site. PW Water shall have right to salvage any abandoned items; Coordinate with Power Utility (Dominion Energy) for electrical service to the new Hoadly Booster Pumping Station, to include conduit and meter base installation; Site improvements, permanent restoration to include paving and seeding, and fence as shown on the Contract Documents; Miscellaneous work as shown on the Drawings and as specified.